Developer

AZIZI DEVELOPMENTS L.L.C

DLD developer number 1002Registered with DLD on 12 May 2014

On the DLD projects register

Projects
150
Live
59
Completed
91
Cancelled
0
Planned completion in the next 12 months
28
Started in 2026
9

Planned completion dates moved 2 times since we started checking in Oct 2026, across 2 of 150 projects.

These are the register's current dates. A planned date that moved before we started checking isn't recorded, so this page doesn't say whether a project finished on time.

Source: DLD developers and projects registers, read 11 Nov 2026.

Projects

Newest start first. Each bar runs from the start date to the register's current planned completion date.

  1. Azizi Abraham
    Registered status: Active
    2% complete

    Jabal Ali Industrial Second · 420 units, 1 building

    Started
    04 Jul 2026
    Current planned completion
    04 Aug 2027

    190 unit and villa sales in the year to Sep 2026

  2. Azizi Noura
    Registered status: Not started
    0% complete

    Jabal Ali Industrial Second · 269 units, 1 building

    Started
    04 Jul 2026
    Current planned completion
    04 Jul 2028

    176 unit and villa sales in the year to Sep 2026

  3. Azizi Gabriel
    Registered status: Not started
    0% complete

    Jabal Ali Industrial Second · 234 units, 1 building

    Started
    04 Jul 2026
    Current planned completion
    04 Jul 2028

    164 unit and villa sales in the year to Sep 2026

  4. Azizi Rose
    Registered status: Not started
    0% complete

    Jabal Ali Industrial Second · 226 units, 1 building

    Started
    04 Jul 2026
    Current planned completion
    04 Jul 2028

    40 unit and villa sales in the year to Sep 2026

  5. Azizi Wares
    Registered status: Active
    2% complete

    Jabal Ali Industrial Second · 336 units, 1 building

    Started
    04 Mar 2026
    Current planned completion
    04 Mar 2028

    Planned date moved once since we started checking in Oct 2026

    162 unit and villa sales in the year to Sep 2026

  6. Azizi Leily
    Registered status: Active
    2% complete

    Al Jadaf · 272 units, 1 building

    Started
    04 Mar 2026
    Current planned completion
    30 Sep 2028

    31 unit and villa sales in the year to Sep 2026

  7. DLD project 4402
    Registered status: Pending
    0% complete

    Al Jadaf · 1,276 units, 3 buildings

    Started
    13 Feb 2026
    Current planned completion
    09 Feb 2029
  8. Azizi David
    Registered status: Active
    2% complete

    Al Jadaf · 256 units, 1 building

    Started
    03 Feb 2026
    Current planned completion
    30 Sep 2028

    Planned date moved once since we started checking in Oct 2026

    136 unit and villa sales in the year to Sep 2026

  9. Azizi Lina
    Registered status: Active
    2% complete

    Jabal Ali Industrial Second · 242 units, 1 building

    Started
    03 Feb 2026
    Current planned completion
    30 Sep 2028

    157 unit and villa sales in the year to Sep 2026

  10. Azizi Milan Heights
    Registered status: Not started
    0% complete

    Wadi Al Safa 4 · 2,852 units, 5 buildings

    Started
    08 Sep 2025
    Current planned completion
    08 Sep 2028

    789 unit and villa sales in the year to Sep 2026

  11. Azizi Amir
    Registered status: Active
    2.4% complete

    Jabal Ali First · 104 units, 1 building

    Started
    17 Jun 2025
    Current planned completion
    17 Jun 2027

    51 unit and villa sales in the year to Sep 2026

  12. Azizi Sikander
    Registered status: Active
    2% complete

    Jabal Ali First · 226 units, 1 building

    Started
    17 Jun 2025
    Current planned completion
    17 Jun 2027

    87 unit and villa sales in the year to Sep 2026

138 more projects
  1. Azizi Milan 28
    Registered status: Not started
    0% complete

    Wadi Al Safa 4 · 610 units, 1 building

    Started
    03 Jun 2025
    Current planned completion
    03 Jun 2027

    85 unit and villa sales in the year to Sep 2026

  2. Azizi Venice 16
    Registered status: Not started
    0% complete

    Madinat Al Mataar · 1,055 units, 1 building

    Started
    02 Jun 2025
    Current planned completion
    02 Jun 2027

    287 unit and villa sales in the year to Sep 2026

  3. Azizi Riviera 64
    Registered status: Active
    83.8% complete

    Al Merkadh · 127 units, 1 building

    Started
    23 May 2025
    Current planned completion
    30 May 2027
  4. Azizi Riviera 68
    Registered status: Active
    74.6% complete

    Al Merkadh · 112 units, 1 building

    Started
    23 May 2025
    Current planned completion
    30 May 2027

    67 unit and villa sales in the year to Sep 2026

  5. Azizi Venice 15
    Registered status: Not started
    0% complete

    Madinat Al Mataar · 1,855 units, 2 buildings

    Started
    02 May 2025
    Current planned completion
    30 May 2027

    802 unit and villa sales in the year to Sep 2026

  6. Azizi Milan 9
    Registered status: Not started
    0% complete

    Wadi Al Safa 4 · 1,180 units, 1 building

    Started
    01 May 2025
    Current planned completion
    30 May 2027

    165 unit and villa sales in the year to Sep 2026

  7. Azizi riviera 58
    Registered status: Finished

    Al Merkadh · 90 units, 1 building

    Started
    01 May 2025
    Current planned completion
    30 May 2027
    Completed
    18 Aug 2026

    3 unit and villa sales in the year to Sep 2026

  8. Azizi Riviera 66
    Registered status: Active
    91% complete

    Al Merkadh · 112 units, 1 building

    Started
    01 May 2025
    Current planned completion
    30 May 2027

    22 unit and villa sales in the year to Sep 2026

  9. Azizi Riviera 54
    Registered status: Active
    74.6% complete

    Al Merkadh · 203 units, 1 building

    Started
    01 May 2025
    Current planned completion
    30 May 2027
  10. DLD project 3740
    Registered status: Pending
    0% complete

    Al Merkadh

    Started
    01 May 2025
    Current planned completion
    30 May 2027
  11. Azizi Milan 18
    Registered status: Not started
    0% complete

    Wadi Al Safa 4 · 1,541 units, 1 building

    Started
    16 Apr 2025
    Current planned completion
    16 Apr 2027

    1 unit or villa sale in the year to Sep 2026

  12. Azizi Milan 53
    Registered status: Not started
    0% complete

    Wadi Al Safa 4 · 306 units, 1 building

    Started
    16 Apr 2025
    Current planned completion
    30 Apr 2027

    94 unit and villa sales in the year to Sep 2026

  13. Azizi Milan 55
    Registered status: Not started
    0% complete

    Wadi Al Safa 4 · 465 units, 1 building

    Started
    16 Apr 2025
    Current planned completion
    30 Apr 2027

    224 unit and villa sales in the year to Sep 2026

  14. Azizi Milan 20
    Registered status: Not started
    0% complete

    Wadi Al Safa 4 · 741 units, 1 building

    Started
    07 Apr 2025
    Current planned completion
    30 Apr 2027

    330 unit and villa sales in the year to Sep 2026

  15. Azizi Milan 30
    Registered status: Not started
    0% complete

    Wadi Al Safa 4 · 780 units, 1 building

    Started
    04 Apr 2025
    Current planned completion
    04 Apr 2027

    349 unit and villa sales in the year to Sep 2026

  16. AZIZI MILAN 51
    Registered status: Not started
    0% complete

    Wadi Al Safa 4 · 579 units, 1 building

    Started
    26 Mar 2025
    Current planned completion
    26 Mar 2027

    196 unit and villa sales in the year to Sep 2026

  17. Azizi Riviera 49
    Registered status: Active
    54.4% complete

    Al Merkadh · 234 units, 1 building

    Started
    13 Mar 2025
    Current planned completion
    13 Mar 2027

    76 unit and villa sales in the year to Sep 2026

  18. Azizi Riviera 50
    Registered status: Active
    60.9% complete

    Al Merkadh · 234 units, 1 building

    Started
    13 Mar 2025
    Current planned completion
    13 Mar 2027

    77 unit and villa sales in the year to Sep 2026

  19. Azizi Riviera 53
    Registered status: Active
    63.2% complete

    Al Merkadh · 225 units, 1 building

    Started
    13 Mar 2025
    Current planned completion
    13 Mar 2027
  20. Azizi Riviera 55
    Registered status: Finished

    Al Merkadh · 124 units, 1 building

    Started
    13 Mar 2025
    Current planned completion
    13 Mar 2027
    Completed
    21 Jan 2026

    3 unit and villa sales in the year to Sep 2026

  21. Azizi Riviera 56
    Registered status: Finished

    Al Merkadh · 87 units, 1 building

    Started
    13 Mar 2025
    Current planned completion
    13 Mar 2027
    Completed
    29 Apr 2026
  22. DLD project 3618
    Registered status: Active
    97.1% complete

    Al Merkadh · 87 units, 1 building

    Started
    13 Mar 2025
    Current planned completion
    13 Mar 2027
  23. Azizi Riviera 62
    Registered status: Active
    90.8% complete

    Al Merkadh · 112 units, 1 building

    Started
    13 Mar 2025
    Current planned completion
    13 Mar 2027
  24. Azizi Emerald
    Registered status: Active
    3% complete

    Um Hurair Second · 102 units, 1 building

    Started
    13 Feb 2025
    Current planned completion
    13 Feb 2028
  25. WASL BY AZIZI
    Registered status: Active
    2% complete

    Palm Deira · 227 units, 1 building

    Started
    12 Feb 2025
    Current planned completion
    12 Feb 2028

    67 unit and villa sales in the year to Sep 2026

  26. Azizi Ruby
    Registered status: Active
    3% complete

    Al Barsha South Fourth · 264 units, 1 building

    Started
    23 Jan 2025
    Current planned completion
    23 Jan 2028

    89 unit and villa sales in the year to Sep 2026

  27. Arian By Azizi
    Registered status: Active
    2% complete

    Jabal Ali Industrial Second · 631 units, 1 building

    Started
    16 Jan 2025
    Current planned completion
    16 Jan 2028

    398 unit and villa sales in the year to Sep 2026

  28. RAFFI BY AZIZI
    Registered status: Active
    2% complete

    Jabal Ali First · 171 units, 1 building

    Started
    15 Jan 2025
    Current planned completion
    15 Jan 2028

    65 unit and villa sales in the year to Sep 2026

  29. Azizi Venice 6
    Registered status: Active
    11.6% complete

    Madinat Al Mataar · 2,965 units, 9 buildings

    Started
    25 Dec 2024
    Current planned completion
    31 Dec 2027

    933 unit and villa sales in the year to Sep 2026

  30. AZIZI ZAIN
    Registered status: Active
    80.2% complete

    Jabal Ali First · 115 units, 1 building

    Started
    11 Oct 2024
    Current planned completion
    11 Oct 2027

    80 unit and villa sales in the year to Sep 2026

  31. azizi venice 12
    Registered status: Active
    21.6% complete

    Madinat Al Mataar · 1,428 units, 2 buildings

    Started
    25 Sep 2024
    Current planned completion
    25 Sep 2027

    568 unit and villa sales in the year to Sep 2026

  32. azizi venice 13
    Registered status: Active
    45.9% complete

    Madinat Al Mataar · 1,888 units, 2 buildings

    Started
    16 Sep 2024
    Current planned completion
    16 Sep 2027

    642 unit and villa sales in the year to Sep 2026

  33. BURJ AZIZI
    Registered status: Active
    7.5% complete

    Trade Center First · 1,072 units, 1 building

    Started
    21 Aug 2024
    Current planned completion
    30 Aug 2030

    3 unit and villa sales in the year to Sep 2026

  34. AZIZI VENICE 11
    Registered status: Active
    25.9% complete

    Madinat Al Mataar · 1,094 units, 1 building

    Started
    14 Aug 2024
    Current planned completion
    30 Aug 2027

    435 unit and villa sales in the year to Sep 2026

  35. AZIZI NEILA
    Registered status: Active
    38.5% complete

    Jabal Ali First · 274 units, 1 building

    Started
    23 Jul 2024
    Current planned completion
    30 Jul 2027

    109 unit and villa sales in the year to Sep 2026

  36. AZIZI VENICE 14
    Registered status: Active
    30.3% complete

    Madinat Al Mataar · 3,438 units, 8 buildings

    Started
    02 May 2024
    Current planned completion
    30 May 2026

    2,024 unit and villa sales in the year to Sep 2026

  37. BEACH OASIS 2
    Registered status: Active
    53.2% complete

    Al Hebiah Second · 704 units, 2 buildings

    Started
    15 Apr 2024
    Current planned completion
    30 Apr 2026

    331 unit and villa sales in the year to Sep 2026

  38. AZIZI JEWEL
    Registered status: Active
    43% complete

    Jabal Ali First · 280 units, 1 building

    Started
    21 Mar 2024
    Current planned completion
    Not published

    129 unit and villa sales in the year to Sep 2026

  39. AZIZI RIVIERA 69
    Registered status: Finished

    Al Merkadh · 123 units, 1 building

    Started
    15 Mar 2024
    Current planned completion
    30 Mar 2026
    Completed
    28 Nov 2025

    46 unit and villa sales in the year to Sep 2026

  40. AZIZI VENICE 10
    Registered status: Active
    36.3% complete

    Madinat Al Mataar · 1,263 units, 3 buildings

    Started
    29 Jan 2024
    Current planned completion
    Not published

    467 unit and villa sales in the year to Sep 2026

  41. AZIZI VENICE 7
    Registered status: Active
    29.2% complete

    Madinat Al Mataar · 2,276 units, 6 buildings

    Started
    29 Jan 2024
    Current planned completion
    28 Jan 2026

    670 unit and villa sales in the year to Sep 2026

  42. ADEBA AZIZI
    Registered status: Active
    75.5% complete

    Al Jadaf · 304 units, 1 building

    Started
    02 Jan 2024
    Current planned completion
    Not published

    154 unit and villa sales in the year to Sep 2026

  43. AZIZI RIVIERA 67
    Registered status: Finished

    Al Merkadh · 198 units, 1 building

    Started
    28 Dec 2023
    Current planned completion
    27 Mar 2025
    Completed
    27 Mar 2025

    28 unit and villa sales in the year to Sep 2026

  44. AZIZI VENICE 9
    Registered status: Active
    54% complete

    Madinat Al Mataar · 778 units, 3 buildings

    Started
    23 Oct 2023
    Current planned completion
    Not published

    313 unit and villa sales in the year to Sep 2026

  45. AZIZI VENICE 8
    Registered status: Active
    53% complete

    Madinat Al Mataar · 778 units, 3 buildings

    Started
    23 Oct 2023
    Current planned completion
    Not published

    252 unit and villa sales in the year to Sep 2026

  46. AZIZI VENICE 2
    Registered status: Active
    57.2% complete

    Madinat Al Mataar · 526 units, 1 building

    Started
    13 Oct 2023
    Current planned completion
    30 Dec 2025

    193 unit and villa sales in the year to Sep 2026

  47. AZIZI VENICE 1
    Registered status: Active
    67.4% complete

    Madinat Al Mataar · 143 units, 1 building

    Started
    13 Oct 2023
    Current planned completion
    30 Dec 2025

    44 unit and villa sales in the year to Sep 2026

  48. AZIZI VENICE 5
    Registered status: Active
    63.5% complete

    Madinat Al Mataar · 484 units, 2 buildings

    Started
    13 Oct 2023
    Current planned completion
    30 Oct 2025

    187 unit and villa sales in the year to Sep 2026

  49. AZIZI RIVIERA 61
    Registered status: Finished

    Al Merkadh · 240 units, 1 building

    Started
    12 Oct 2023
    Current planned completion
    27 Mar 2025
    Completed
    27 Mar 2025

    43 unit and villa sales in the year to Sep 2026

  50. AZIZI VENICE 3
    Registered status: Active
    76% complete

    Madinat Al Mataar · 352 units, 2 buildings

    Started
    27 Sep 2023
    Current planned completion
    30 Dec 2025

    50 unit and villa sales in the year to Sep 2026

  51. AZIZI VENICE 4
    Registered status: Active
    62.2% complete

    Madinat Al Mataar · 389 units, 3 buildings

    Started
    27 Sep 2023
    Current planned completion
    30 Dec 2025

    86 unit and villa sales in the year to Sep 2026

  52. Azizi Central
    Registered status: Finished

    Jabal Ali First · 97 units, 1 building

    Started
    03 Aug 2023
    Current planned completion
    Not published
    Completed
    09 Jun 2026

    86 unit and villa sales in the year to Sep 2026

  53. AZIZI RIVIERA 63
    Registered status: Finished

    Al Merkadh · 122 units, 1 building

    Started
    26 May 2023
    Current planned completion
    13 Feb 2025
    Completed
    13 Feb 2025

    28 unit and villa sales in the year to Sep 2026

  54. Azizi Riviera 59
    Registered status: Finished

    Al Merkadh · 123 units, 1 building

    Started
    04 May 2023
    Current planned completion
    14 Feb 2025
    Completed
    14 Feb 2025

    15 unit and villa sales in the year to Sep 2026

  55. AZIZI VISTA
    Registered status: Finished

    Al Hebiah Second · 163 units, 1 building

    Started
    27 Apr 2023
    Current planned completion
    30 Apr 2025
    Completed
    30 Sep 2025

    55 unit and villa sales in the year to Sep 2026

  56. AZIZI AMBER
    Registered status: Finished

    Jabal Ali First · 115 units, 1 building

    Started
    23 Mar 2023
    Current planned completion
    31 Jul 2025
    Completed
    31 Jul 2025

    17 unit and villa sales in the year to Sep 2026

  57. AZIZI RIVIERA AZURE
    Registered status: Finished

    Al Merkadh · 124 units, 1 building

    Started
    08 Nov 2022
    Current planned completion
    30 Jul 2025
    Completed
    30 Jul 2025

    17 unit and villa sales in the year to Sep 2026

  58. Azizi Riviera Reve
    Registered status: Active
    76.6% complete

    Al Merkadh · 455 units, 4 buildings

    Started
    01 Jul 2022
    Current planned completion
    05 Feb 2025

    83 unit and villa sales in the year to Sep 2026

  59. AZIZI RIVIERA 65
    Registered status: Finished

    Al Merkadh · 169 units, 1 building

    Started
    05 Jun 2022
    Current planned completion
    27 Mar 2025
    Completed
    27 Mar 2025

    30 unit and villa sales in the year to Sep 2026

  60. Azizi Riviera Beachfront
    Registered status: Finished

    Al Merkadh · 609 units, 4 buildings

    Started
    01 Apr 2021
    Current planned completion
    30 Dec 2025
    Completed
    31 Dec 2025

    104 unit and villa sales in the year to Sep 2026

  61. Azizi Riviera 46
    Registered status: Finished

    Al Merkadh · 418 units, 1 building

    Started
    23 Nov 2020
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    30 unit and villa sales in the year to Sep 2026

  62. Azizi Riviera 45
    Registered status: Finished

    Al Merkadh · 190 units, 1 building

    Started
    23 Nov 2020
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    13 unit and villa sales in the year to Sep 2026

  63. Azizi Riviera 44
    Registered status: Finished

    Al Merkadh · 279 units, 1 building

    Started
    23 Nov 2020
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    20 unit and villa sales in the year to Sep 2026

  64. Azizi Riviera 36
    Registered status: Finished

    Al Merkadh · 214 units, 1 building

    Started
    23 Nov 2020
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    7 unit and villa sales in the year to Sep 2026

  65. Azizi Riviera 42
    Registered status: Finished

    Al Merkadh · 185 units, 1 building

    Started
    23 Nov 2020
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    11 unit and villa sales in the year to Sep 2026

  66. Azizi Riviera 43
    Registered status: Finished

    Al Merkadh · 293 units, 1 building

    Started
    23 Nov 2020
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    26 unit and villa sales in the year to Sep 2026

  67. Azizi Riviera 41
    Registered status: Finished

    Al Merkadh · 248 units, 1 building

    Started
    23 Nov 2020
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    28 unit and villa sales in the year to Sep 2026

  68. Azizi Riviera 47
    Registered status: Finished

    Al Merkadh · 194 units, 1 building

    Started
    23 Nov 2020
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    21 unit and villa sales in the year to Sep 2026

  69. Azizi Riviera 28
    Registered status: Finished

    Al Merkadh · 243 units, 1 building

    Started
    12 Dec 2018
    Current planned completion
    12 Sep 2023
    Completed
    12 Sep 2023

    16 unit and villa sales in the year to Sep 2026

  70. Azizi Riviera 26
    Registered status: Finished

    Al Merkadh · 270 units, 1 building

    Started
    12 Dec 2018
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    15 unit and villa sales in the year to Sep 2026

  71. Azizi Riviera 24
    Registered status: Finished

    Al Merkadh · 211 units, 1 building

    Started
    12 Dec 2018
    Current planned completion
    30 Mar 2023
    Completed
    30 Mar 2023

    10 unit and villa sales in the year to Sep 2026

  72. Azizi Riviera 27
    Registered status: Finished

    Al Merkadh · 234 units, 1 building

    Started
    12 Dec 2018
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    19 unit and villa sales in the year to Sep 2026

  73. Azizi Riviera 29
    Registered status: Finished

    Al Merkadh · 176 units, 1 building

    Started
    12 Dec 2018
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    10 unit and villa sales in the year to Sep 2026

  74. Azizi Riviera 30
    Registered status: Finished

    Al Merkadh · 135 units, 1 building

    Started
    12 Dec 2018
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    3 unit and villa sales in the year to Sep 2026

  75. Azizi Riviera 39
    Registered status: Finished

    Al Merkadh · 171 units, 1 building

    Started
    12 Dec 2018
    Current planned completion
    04 Mar 2024
    Completed
    04 Mar 2024

    15 unit and villa sales in the year to Sep 2026

  76. Azizi Riviera 40
    Registered status: Finished

    Al Merkadh · 165 units, 1 building

    Started
    12 Dec 2018
    Current planned completion
    16 May 2024
    Completed
    16 May 2024

    9 unit and villa sales in the year to Sep 2026

  77. Azizi Riviera 48
    Registered status: Finished

    Al Merkadh · 335 units, 1 building

    Started
    12 Dec 2018
    Current planned completion
    04 Mar 2024
    Completed
    04 Mar 2024

    23 unit and villa sales in the year to Sep 2026

  78. Azizi Riviera 37
    Registered status: Finished

    Al Merkadh · 241 units, 1 building

    Started
    01 Jun 2018
    Current planned completion
    04 Mar 2024
    Completed
    04 Mar 2024

    21 unit and villa sales in the year to Sep 2026

  79. Azizi Riviera 38
    Registered status: Finished

    Al Merkadh · 161 units, 1 building

    Started
    01 Jun 2018
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    12 unit and villa sales in the year to Sep 2026

  80. Fawad Azizi Residence
    Registered status: Finished

    Al Jadaf · 378 units, 1 building

    Started
    10 May 2018
    Current planned completion
    02 Apr 2024
    Completed
    02 Apr 2024

    45 unit and villa sales in the year to Sep 2026

  81. Azizi Riviera 31
    Registered status: Finished

    Al Merkadh · 134 units, 1 building

    Started
    15 Apr 2018
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    8 unit and villa sales in the year to Sep 2026

  82. Azizi Mirage 1
    Registered status: Finished

    Al Hebiah Second · 762 units, 2 buildings

    Started
    01 Feb 2018
    Current planned completion
    30 Apr 2025
    Completed
    16 Oct 2025

    449 unit and villa sales in the year to Sep 2026

  83. Azizi Greenfield
    Registered status: Finished

    Nad Al Shiba First · 102 units, 1 building

    Started
    01 Feb 2018
    Current planned completion
    08 Mar 2024
    Completed
    08 Mar 2024

    9 unit and villa sales in the year to Sep 2026

  84. Azizi Grand
    Registered status: Active
    82.1% complete

    Al Hebiah Fourth · 411 units, 1 building

    Started
    01 Feb 2018
    Current planned completion
    02 Feb 2025

    188 unit and villa sales in the year to Sep 2026

  85. Azizi Gardens
    Registered status: Finished

    Nad Al Shiba First · 82 units, 1 building

    Started
    01 Feb 2018
    Current planned completion
    11 Dec 2023
    Completed
    11 Dec 2023

    9 unit and villa sales in the year to Sep 2026

  86. Azizi Park Avenue
    Registered status: Finished

    Nad Al Shiba First · 124 units, 1 building

    Started
    01 Feb 2018
    Current planned completion
    18 Jan 2024
    Completed
    18 Jan 2024

    6 unit and villa sales in the year to Sep 2026

  87. Azizi Riviera 10
    Registered status: Finished

    Al Merkadh · 131 units, 1 building

    Started
    15 Dec 2017
    Current planned completion
    30 Sep 2022
    Completed
    23 Aug 2022

    10 unit and villa sales in the year to Sep 2026

  88. Azizi Riviera 8
    Registered status: Finished

    Al Merkadh · 216 units, 1 building

    Started
    15 Dec 2017
    Current planned completion
    07 Jun 2023
    Completed
    07 Jun 2023

    23 unit and villa sales in the year to Sep 2026

  89. Azizi Riviera 18
    Registered status: Finished

    Al Merkadh · 282 units, 1 building

    Started
    15 Dec 2017
    Current planned completion
    14 Jul 2023
    Completed
    14 Jul 2023

    11 unit and villa sales in the year to Sep 2026

  90. Azizi Riviera 19
    Registered status: Finished

    Al Merkadh · 207 units, 1 building

    Started
    15 Dec 2017
    Current planned completion
    16 Oct 2023
    Completed
    16 Oct 2023

    11 unit and villa sales in the year to Sep 2026

  91. Azizi Riviera 22
    Registered status: Finished

    Al Merkadh · 157 units, 1 building

    Started
    15 Dec 2017
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    7 unit and villa sales in the year to Sep 2026

  92. Azizi Riviera 14
    Registered status: Finished

    Al Merkadh · 228 units, 1 building

    Started
    01 Dec 2017
    Current planned completion
    30 Sep 2022
    Completed
    25 May 2023

    21 unit and villa sales in the year to Sep 2026

  93. Azizi Riviera 25
    Registered status: Finished

    Al Merkadh · 276 units, 1 building

    Started
    15 Nov 2017
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    12 unit and villa sales in the year to Sep 2026

  94. Azizi Riviera 23
    Registered status: Finished

    Al Merkadh · 248 units, 1 building

    Started
    01 Nov 2017
    Current planned completion
    31 Dec 2022
    Completed
    31 Dec 2022

    16 unit and villa sales in the year to Sep 2026

  95. Azizi Riviera 7
    Registered status: Finished

    Al Merkadh · 158 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    23 Aug 2022
    Completed
    23 Aug 2022

    8 unit and villa sales in the year to Sep 2026

  96. Azizi Riviera 4
    Registered status: Finished

    Al Merkadh · 212 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    30 Sep 2022
    Completed
    31 Oct 2022

    16 unit and villa sales in the year to Sep 2026

  97. Azizi Riviera 3
    Registered status: Finished

    Al Merkadh · 301 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    16 May 2024
    Completed
    16 May 2024

    14 unit and villa sales in the year to Sep 2026

  98. Azizi Riviera 2
    Registered status: Finished

    Al Merkadh · 62 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    30 Sep 2022
    Completed
    30 Sep 2022

    2 unit and villa sales in the year to Sep 2026

  99. Azizi Riviera 6
    Registered status: Finished

    Al Merkadh · 160 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    30 Sep 2022
    Completed
    30 Sep 2022

    7 unit and villa sales in the year to Sep 2026

  100. Azizi Riviera 1
    Registered status: Finished

    Al Merkadh · 378 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    25 Jul 2024
    Completed
    25 Jul 2024

    26 unit and villa sales in the year to Sep 2026

  101. Azizi Riviera 21
    Registered status: Finished

    Al Merkadh · 157 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    5 unit and villa sales in the year to Sep 2026

  102. Azizi Riviera 20
    Registered status: Finished

    Al Merkadh · 250 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    31 Dec 2022
    Completed
    31 Dec 2022

    11 unit and villa sales in the year to Sep 2026

  103. Azizi Riviera 12
    Registered status: Finished

    Al Merkadh · 135 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    30 Sep 2022
    Completed
    30 Sep 2022

    10 unit and villa sales in the year to Sep 2026

  104. Azizi Riviera 11
    Registered status: Finished

    Al Merkadh · 135 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    30 Sep 2022
    Completed
    13 Sep 2022

    8 unit and villa sales in the year to Sep 2026

  105. Azizi Riviera 15
    Registered status: Finished

    Al Merkadh · 251 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    14 Jul 2023
    Completed
    14 Jul 2023

    11 unit and villa sales in the year to Sep 2026

  106. Azizi Riviera 13
    Registered status: Finished

    Al Merkadh · 234 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    30 Apr 2022
    Completed
    10 Nov 2022

    10 unit and villa sales in the year to Sep 2026

  107. Azizi Riviera 33
    Registered status: Finished

    Al Merkadh · 204 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    13 Sep 2023
    Completed
    13 Sep 2023

    19 unit and villa sales in the year to Sep 2026

  108. Azizi Riviera 35
    Registered status: Finished

    Al Merkadh · 252 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    14 Sep 2023
    Completed
    14 Sep 2023

    12 unit and villa sales in the year to Sep 2026

  109. Azizi Riviera 32
    Registered status: Finished

    Al Merkadh · 247 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    17 unit and villa sales in the year to Sep 2026

  110. Azizi Riviera 34
    Registered status: Finished

    Al Merkadh · 250 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    14 Sep 2023
    Completed
    14 Sep 2023

    9 unit and villa sales in the year to Sep 2026

  111. Azizi Riviera 17
    Registered status: Finished

    Al Merkadh · 211 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    30 Sep 2022
    Completed
    30 Sep 2022

    16 unit and villa sales in the year to Sep 2026

  112. Azizi Riviera 9
    Registered status: Finished

    Al Merkadh · 231 units, 1 building

    Started
    01 Oct 2017
    Current planned completion
    22 Jun 2023
    Completed
    22 Jun 2023

    17 unit and villa sales in the year to Sep 2026

  113. Farhad Azizi Residence
    Registered status: Finished

    Al Jadaf · 662 units, 1 building

    Started
    01 Jul 2017
    Current planned completion
    14 Jul 2022
    Completed
    14 Jul 2022

    61 unit and villa sales in the year to Sep 2026

  114. Azizi Pearl
    Registered status: Finished

    Jabal Ali First · 223 units, 1 building

    Started
    01 Jul 2017
    Current planned completion
    05 Jun 2024
    Completed
    05 Jun 2024

    28 unit and villa sales in the year to Sep 2026

  115. Azizi Berton
    Registered status: Finished

    Jabal Ali First · 250 units, 1 building

    Started
    01 Jul 2017
    Current planned completion
    08 Aug 2023
    Completed
    08 Aug 2023

    16 unit and villa sales in the year to Sep 2026

  116. Azizi Riviera 5
    Registered status: Finished

    Al Merkadh · 221 units, 1 building

    Started
    01 Jul 2017
    Current planned completion
    25 May 2023
    Completed
    25 May 2023

    13 unit and villa sales in the year to Sep 2026

  117. Azizi Riviera 16
    Registered status: Finished

    Al Merkadh · 262 units, 1 building

    Started
    01 Jul 2017
    Current planned completion
    30 Sep 2022
    Completed
    30 Sep 2022

    13 unit and villa sales in the year to Sep 2026

  118. Azizi Aura Residences
    Registered status: Finished

    Jabal Ali Industrial Second · 487 units, 1 building

    Started
    01 May 2017
    Current planned completion
    31 May 2020
    Completed
    20 Dec 2020

    52 unit and villa sales in the year to Sep 2026

  119. Azizi Aliyah Residences
    Registered status: Finished

    Al Jadaf · 359 units, 1 building

    Started
    01 Oct 2016
    Current planned completion
    31 Aug 2019
    Completed
    30 Jun 2019

    26 unit and villa sales in the year to Sep 2026

  120. Azizi Plaza Hotel Apartments
    Registered status: Finished

    Jabal Ali First · 448 units, 1 building

    Started
    01 Sep 2016
    Current planned completion
    31 May 2020
    Completed
    03 Nov 2021

    56 unit and villa sales in the year to Sep 2026

  121. Azizi Farishta Residence
    Registered status: Finished

    Jabal Ali First · 295 units, 1 building

    Started
    01 Sep 2016
    Current planned completion
    16 Mar 2020
    Completed
    31 Mar 2020

    25 unit and villa sales in the year to Sep 2026

  122. Azizi Samia Residence
    Registered status: Finished

    Jabal Ali First · 296 units, 1 building

    Started
    01 Sep 2016
    Current planned completion
    09 Jan 2020
    Completed
    09 Jan 2020

    34 unit and villa sales in the year to Sep 2026

  123. Azizi Star Hotel Apartments
    Registered status: Finished

    Jabal Ali First · 500 units, 1 building

    Started
    01 Sep 2016
    Current planned completion
    10 Jan 2022
    Completed
    10 Jan 2022

    56 unit and villa sales in the year to Sep 2026

  124. Azizi Shaista Residence
    Registered status: Finished

    Jabal Ali First · 297 units, 1 building

    Started
    14 Aug 2016
    Current planned completion
    17 Mar 2021
    Completed
    17 Mar 2021

    16 unit and villa sales in the year to Sep 2026

  125. Azizi Mina
    Registered status: Finished

    Palm Jumeirah · 184 units, 1 building

    Started
    15 Jul 2016
    Current planned completion
    14 Jan 2021
    Completed
    07 Apr 2021

    17 unit and villa sales in the year to Sep 2026

  126. Roy Mediterranean Hotel Apartments
    Registered status: Finished

    Jabal Ali First · 273 units, 1 building

    Started
    15 May 2016
    Current planned completion
    11 Mar 2018
    Completed
    31 Jan 2018

    28 unit and villa sales in the year to Sep 2026

  127. Montrell Hotel Aprtments
    Registered status: Finished

    Jabal Ali First · 224 units, 1 building

    Started
    15 May 2016
    Current planned completion
    21 Mar 2018
    Completed
    30 Jun 2018

    18 unit and villa sales in the year to Sep 2026

  128. CANDACE ACACIA HOTEL APARTMENTS
    Registered status: Finished

    Jabal Ali First · 318 units, 1 building

    Started
    01 Mar 2016
    Current planned completion
    01 Nov 2017
    Completed
    25 Nov 2017

    26 unit and villa sales in the year to Sep 2026

  129. CANDACE ASTER HOTEL APARTMENTS
    Registered status: Finished

    Jabal Ali First · 229 units, 1 building

    Started
    01 Mar 2016
    Current planned completion
    20 Sep 2017
    Completed
    20 Sep 2017

    17 unit and villa sales in the year to Sep 2026

  130. ROYAL BAY
    Registered status: Finished

    Palm Jumeirah · 91 units, 1 building

    Started
    06 May 2015
    Current planned completion
    06 Jan 2017
    Completed
    15 Aug 2017

    9 unit and villa sales in the year to Sep 2026

  131. AZIZI. DAISY
    Registered status: Finished

    Jabal Ali First · 129 units, 1 building

    Started
    30 Oct 2014
    Current planned completion
    07 May 2016
    Completed
    25 Jul 2017

    8 unit and villa sales in the year to Sep 2026

  132. AZIZI. FREESIA
    Registered status: Finished

    Jabal Ali First · 98 units, 1 building

    Started
    30 Oct 2014
    Current planned completion
    14 Nov 2016
    Completed
    05 Jul 2017

    12 unit and villa sales in the year to Sep 2026

  133. AZIZI. TULIP
    Registered status: Finished

    Jabal Ali First · 97 units, 1 building

    Started
    30 Oct 2014
    Current planned completion
    07 May 2016
    Completed
    19 Aug 2017

    3 unit and villa sales in the year to Sep 2026

  134. AZIZI. FEIROUZ
    Registered status: Finished

    Jabal Ali First · 99 units, 2 buildings

    Started
    02 Jun 2014
    Current planned completion
    04 Sep 2016
    Completed
    04 Sep 2016

    10 unit and villa sales in the year to Sep 2026

  135. AZIZI. YASAMINE
    Registered status: Finished

    Jabal Ali First · 109 units, 1 building

    Started
    02 Jun 2014
    Current planned completion
    26 Jul 2016
    Completed
    26 Jul 2016

    6 unit and villa sales in the year to Sep 2026

  136. Azizi. Liatris
    Registered status: Finished

    Jabal Ali First · 129 units, 1 building

    Started
    02 Jun 2014
    Current planned completion
    23 Oct 2016
    Completed
    23 Oct 2016

    5 unit and villa sales in the year to Sep 2026

  137. Azizi. Iris
    Registered status: Finished

    Jabal Ali First · 99 units, 1 building

    Started
    02 Jun 2014
    Current planned completion
    22 Feb 2017
    Completed
    09 Dec 2015

    9 unit and villa sales in the year to Sep 2026

  138. AZIZI. ORCHID
    Registered status: Finished

    Jabal Ali First · 99 units, 1 building

    Started
    02 Jun 2014
    Current planned completion
    30 Nov 2016
    Completed
    30 Nov 2016

    12 unit and villa sales in the year to Sep 2026

A project without a page on this site is named by its DLD project number.

Source: DLD projects register, read 11 Nov 2026.