Developer
AZIZI DEVELOPMENTS L.L.C
DLD developer number 1002Registered with DLD on 12 May 2014
On the DLD projects register
- Projects
- 150
- Live
- 59
- Completed
- 91
- Cancelled
- 0
- Planned completion in the next 12 months
- 28
- Started in 2026
- 9
Planned completion dates moved 2 times since we started checking in Oct 2026, across 2 of 150 projects.
These are the register's current dates. A planned date that moved before we started checking isn't recorded, so this page doesn't say whether a project finished on time.
Source: DLD developers and projects registers, read 11 Nov 2026.
Projects
Newest start first. Each bar runs from the start date to the register's current planned completion date.
- Azizi AbrahamRegistered status: Active2% complete
Jabal Ali Industrial Second · 420 units, 1 building
- Started
- 04 Jul 2026
- Current planned completion
- 04 Aug 2027
190 unit and villa sales in the year to Sep 2026
- Azizi NouraRegistered status: Not started0% complete
Jabal Ali Industrial Second · 269 units, 1 building
- Started
- 04 Jul 2026
- Current planned completion
- 04 Jul 2028
176 unit and villa sales in the year to Sep 2026
- Azizi GabrielRegistered status: Not started0% complete
Jabal Ali Industrial Second · 234 units, 1 building
- Started
- 04 Jul 2026
- Current planned completion
- 04 Jul 2028
164 unit and villa sales in the year to Sep 2026
- Azizi RoseRegistered status: Not started0% complete
Jabal Ali Industrial Second · 226 units, 1 building
- Started
- 04 Jul 2026
- Current planned completion
- 04 Jul 2028
40 unit and villa sales in the year to Sep 2026
- Azizi WaresRegistered status: Active2% complete
Jabal Ali Industrial Second · 336 units, 1 building
- Started
- 04 Mar 2026
- Current planned completion
- 04 Mar 2028
Planned date moved once since we started checking in Oct 2026
162 unit and villa sales in the year to Sep 2026
- Azizi LeilyRegistered status: Active2% complete
Al Jadaf · 272 units, 1 building
- Started
- 04 Mar 2026
- Current planned completion
- 30 Sep 2028
31 unit and villa sales in the year to Sep 2026
- DLD project 4402Registered status: Pending0% complete
Al Jadaf · 1,276 units, 3 buildings
- Started
- 13 Feb 2026
- Current planned completion
- 09 Feb 2029
- Azizi DavidRegistered status: Active2% complete
Al Jadaf · 256 units, 1 building
- Started
- 03 Feb 2026
- Current planned completion
- 30 Sep 2028
Planned date moved once since we started checking in Oct 2026
136 unit and villa sales in the year to Sep 2026
- Azizi LinaRegistered status: Active2% complete
Jabal Ali Industrial Second · 242 units, 1 building
- Started
- 03 Feb 2026
- Current planned completion
- 30 Sep 2028
157 unit and villa sales in the year to Sep 2026
- Azizi Milan HeightsRegistered status: Not started0% complete
Wadi Al Safa 4 · 2,852 units, 5 buildings
- Started
- 08 Sep 2025
- Current planned completion
- 08 Sep 2028
789 unit and villa sales in the year to Sep 2026
- Azizi AmirRegistered status: Active2.4% complete
Jabal Ali First · 104 units, 1 building
- Started
- 17 Jun 2025
- Current planned completion
- 17 Jun 2027
51 unit and villa sales in the year to Sep 2026
- Azizi SikanderRegistered status: Active2% complete
Jabal Ali First · 226 units, 1 building
- Started
- 17 Jun 2025
- Current planned completion
- 17 Jun 2027
87 unit and villa sales in the year to Sep 2026
138 more projects
- Azizi Milan 28Registered status: Not started0% complete
Wadi Al Safa 4 · 610 units, 1 building
- Started
- 03 Jun 2025
- Current planned completion
- 03 Jun 2027
85 unit and villa sales in the year to Sep 2026
- Azizi Venice 16Registered status: Not started0% complete
Madinat Al Mataar · 1,055 units, 1 building
- Started
- 02 Jun 2025
- Current planned completion
- 02 Jun 2027
287 unit and villa sales in the year to Sep 2026
- Azizi Riviera 64Registered status: Active83.8% complete
Al Merkadh · 127 units, 1 building
- Started
- 23 May 2025
- Current planned completion
- 30 May 2027
- Azizi Riviera 68Registered status: Active74.6% complete
Al Merkadh · 112 units, 1 building
- Started
- 23 May 2025
- Current planned completion
- 30 May 2027
67 unit and villa sales in the year to Sep 2026
- Azizi Venice 15Registered status: Not started0% complete
Madinat Al Mataar · 1,855 units, 2 buildings
- Started
- 02 May 2025
- Current planned completion
- 30 May 2027
802 unit and villa sales in the year to Sep 2026
- Azizi Milan 9Registered status: Not started0% complete
Wadi Al Safa 4 · 1,180 units, 1 building
- Started
- 01 May 2025
- Current planned completion
- 30 May 2027
165 unit and villa sales in the year to Sep 2026
- Azizi riviera 58Registered status: Finished
Al Merkadh · 90 units, 1 building
- Started
- 01 May 2025
- Current planned completion
- 30 May 2027
- Completed
- 18 Aug 2026
3 unit and villa sales in the year to Sep 2026
- Azizi Riviera 66Registered status: Active91% complete
Al Merkadh · 112 units, 1 building
- Started
- 01 May 2025
- Current planned completion
- 30 May 2027
22 unit and villa sales in the year to Sep 2026
- Azizi Riviera 54Registered status: Active74.6% complete
Al Merkadh · 203 units, 1 building
- Started
- 01 May 2025
- Current planned completion
- 30 May 2027
- DLD project 3740Registered status: Pending0% complete
Al Merkadh
- Started
- 01 May 2025
- Current planned completion
- 30 May 2027
- Azizi Milan 18Registered status: Not started0% complete
Wadi Al Safa 4 · 1,541 units, 1 building
- Started
- 16 Apr 2025
- Current planned completion
- 16 Apr 2027
1 unit or villa sale in the year to Sep 2026
- Azizi Milan 53Registered status: Not started0% complete
Wadi Al Safa 4 · 306 units, 1 building
- Started
- 16 Apr 2025
- Current planned completion
- 30 Apr 2027
94 unit and villa sales in the year to Sep 2026
- Azizi Milan 55Registered status: Not started0% complete
Wadi Al Safa 4 · 465 units, 1 building
- Started
- 16 Apr 2025
- Current planned completion
- 30 Apr 2027
224 unit and villa sales in the year to Sep 2026
- Azizi Milan 20Registered status: Not started0% complete
Wadi Al Safa 4 · 741 units, 1 building
- Started
- 07 Apr 2025
- Current planned completion
- 30 Apr 2027
330 unit and villa sales in the year to Sep 2026
- Azizi Milan 30Registered status: Not started0% complete
Wadi Al Safa 4 · 780 units, 1 building
- Started
- 04 Apr 2025
- Current planned completion
- 04 Apr 2027
349 unit and villa sales in the year to Sep 2026
- AZIZI MILAN 51Registered status: Not started0% complete
Wadi Al Safa 4 · 579 units, 1 building
- Started
- 26 Mar 2025
- Current planned completion
- 26 Mar 2027
196 unit and villa sales in the year to Sep 2026
- Azizi Riviera 49Registered status: Active54.4% complete
Al Merkadh · 234 units, 1 building
- Started
- 13 Mar 2025
- Current planned completion
- 13 Mar 2027
76 unit and villa sales in the year to Sep 2026
- Azizi Riviera 50Registered status: Active60.9% complete
Al Merkadh · 234 units, 1 building
- Started
- 13 Mar 2025
- Current planned completion
- 13 Mar 2027
77 unit and villa sales in the year to Sep 2026
- Azizi Riviera 53Registered status: Active63.2% complete
Al Merkadh · 225 units, 1 building
- Started
- 13 Mar 2025
- Current planned completion
- 13 Mar 2027
- Azizi Riviera 55Registered status: Finished
Al Merkadh · 124 units, 1 building
- Started
- 13 Mar 2025
- Current planned completion
- 13 Mar 2027
- Completed
- 21 Jan 2026
3 unit and villa sales in the year to Sep 2026
- Azizi Riviera 56Registered status: Finished
Al Merkadh · 87 units, 1 building
- Started
- 13 Mar 2025
- Current planned completion
- 13 Mar 2027
- Completed
- 29 Apr 2026
- DLD project 3618Registered status: Active97.1% complete
Al Merkadh · 87 units, 1 building
- Started
- 13 Mar 2025
- Current planned completion
- 13 Mar 2027
- Azizi Riviera 62Registered status: Active90.8% complete
Al Merkadh · 112 units, 1 building
- Started
- 13 Mar 2025
- Current planned completion
- 13 Mar 2027
- Azizi EmeraldRegistered status: Active3% complete
Um Hurair Second · 102 units, 1 building
- Started
- 13 Feb 2025
- Current planned completion
- 13 Feb 2028
- WASL BY AZIZIRegistered status: Active2% complete
Palm Deira · 227 units, 1 building
- Started
- 12 Feb 2025
- Current planned completion
- 12 Feb 2028
67 unit and villa sales in the year to Sep 2026
- Azizi RubyRegistered status: Active3% complete
Al Barsha South Fourth · 264 units, 1 building
- Started
- 23 Jan 2025
- Current planned completion
- 23 Jan 2028
89 unit and villa sales in the year to Sep 2026
- Arian By AziziRegistered status: Active2% complete
Jabal Ali Industrial Second · 631 units, 1 building
- Started
- 16 Jan 2025
- Current planned completion
- 16 Jan 2028
398 unit and villa sales in the year to Sep 2026
- RAFFI BY AZIZIRegistered status: Active2% complete
Jabal Ali First · 171 units, 1 building
- Started
- 15 Jan 2025
- Current planned completion
- 15 Jan 2028
65 unit and villa sales in the year to Sep 2026
- Azizi Venice 6Registered status: Active11.6% complete
Madinat Al Mataar · 2,965 units, 9 buildings
- Started
- 25 Dec 2024
- Current planned completion
- 31 Dec 2027
933 unit and villa sales in the year to Sep 2026
- AZIZI ZAINRegistered status: Active80.2% complete
Jabal Ali First · 115 units, 1 building
- Started
- 11 Oct 2024
- Current planned completion
- 11 Oct 2027
80 unit and villa sales in the year to Sep 2026
- azizi venice 12Registered status: Active21.6% complete
Madinat Al Mataar · 1,428 units, 2 buildings
- Started
- 25 Sep 2024
- Current planned completion
- 25 Sep 2027
568 unit and villa sales in the year to Sep 2026
- azizi venice 13Registered status: Active45.9% complete
Madinat Al Mataar · 1,888 units, 2 buildings
- Started
- 16 Sep 2024
- Current planned completion
- 16 Sep 2027
642 unit and villa sales in the year to Sep 2026
- BURJ AZIZIRegistered status: Active7.5% complete
Trade Center First · 1,072 units, 1 building
- Started
- 21 Aug 2024
- Current planned completion
- 30 Aug 2030
3 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 11Registered status: Active25.9% complete
Madinat Al Mataar · 1,094 units, 1 building
- Started
- 14 Aug 2024
- Current planned completion
- 30 Aug 2027
435 unit and villa sales in the year to Sep 2026
- AZIZI NEILARegistered status: Active38.5% complete
Jabal Ali First · 274 units, 1 building
- Started
- 23 Jul 2024
- Current planned completion
- 30 Jul 2027
109 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 14Registered status: Active30.3% complete
Madinat Al Mataar · 3,438 units, 8 buildings
- Started
- 02 May 2024
- Current planned completion
- 30 May 2026
2,024 unit and villa sales in the year to Sep 2026
- BEACH OASIS 2Registered status: Active53.2% complete
Al Hebiah Second · 704 units, 2 buildings
- Started
- 15 Apr 2024
- Current planned completion
- 30 Apr 2026
331 unit and villa sales in the year to Sep 2026
- AZIZI JEWELRegistered status: Active43% complete
Jabal Ali First · 280 units, 1 building
- Started
- 21 Mar 2024
- Current planned completion
- Not published
129 unit and villa sales in the year to Sep 2026
- AZIZI RIVIERA 69Registered status: Finished
Al Merkadh · 123 units, 1 building
- Started
- 15 Mar 2024
- Current planned completion
- 30 Mar 2026
- Completed
- 28 Nov 2025
46 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 10Registered status: Active36.3% complete
Madinat Al Mataar · 1,263 units, 3 buildings
- Started
- 29 Jan 2024
- Current planned completion
- Not published
467 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 7Registered status: Active29.2% complete
Madinat Al Mataar · 2,276 units, 6 buildings
- Started
- 29 Jan 2024
- Current planned completion
- 28 Jan 2026
670 unit and villa sales in the year to Sep 2026
- ADEBA AZIZIRegistered status: Active75.5% complete
Al Jadaf · 304 units, 1 building
- Started
- 02 Jan 2024
- Current planned completion
- Not published
154 unit and villa sales in the year to Sep 2026
- AZIZI RIVIERA 67Registered status: Finished
Al Merkadh · 198 units, 1 building
- Started
- 28 Dec 2023
- Current planned completion
- 27 Mar 2025
- Completed
- 27 Mar 2025
28 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 9Registered status: Active54% complete
Madinat Al Mataar · 778 units, 3 buildings
- Started
- 23 Oct 2023
- Current planned completion
- Not published
313 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 8Registered status: Active53% complete
Madinat Al Mataar · 778 units, 3 buildings
- Started
- 23 Oct 2023
- Current planned completion
- Not published
252 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 2Registered status: Active57.2% complete
Madinat Al Mataar · 526 units, 1 building
- Started
- 13 Oct 2023
- Current planned completion
- 30 Dec 2025
193 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 1Registered status: Active67.4% complete
Madinat Al Mataar · 143 units, 1 building
- Started
- 13 Oct 2023
- Current planned completion
- 30 Dec 2025
44 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 5Registered status: Active63.5% complete
Madinat Al Mataar · 484 units, 2 buildings
- Started
- 13 Oct 2023
- Current planned completion
- 30 Oct 2025
187 unit and villa sales in the year to Sep 2026
- AZIZI RIVIERA 61Registered status: Finished
Al Merkadh · 240 units, 1 building
- Started
- 12 Oct 2023
- Current planned completion
- 27 Mar 2025
- Completed
- 27 Mar 2025
43 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 3Registered status: Active76% complete
Madinat Al Mataar · 352 units, 2 buildings
- Started
- 27 Sep 2023
- Current planned completion
- 30 Dec 2025
50 unit and villa sales in the year to Sep 2026
- AZIZI VENICE 4Registered status: Active62.2% complete
Madinat Al Mataar · 389 units, 3 buildings
- Started
- 27 Sep 2023
- Current planned completion
- 30 Dec 2025
86 unit and villa sales in the year to Sep 2026
- Azizi CentralRegistered status: Finished
Jabal Ali First · 97 units, 1 building
- Started
- 03 Aug 2023
- Current planned completion
- Not published
- Completed
- 09 Jun 2026
86 unit and villa sales in the year to Sep 2026
- AZIZI RIVIERA 63Registered status: Finished
Al Merkadh · 122 units, 1 building
- Started
- 26 May 2023
- Current planned completion
- 13 Feb 2025
- Completed
- 13 Feb 2025
28 unit and villa sales in the year to Sep 2026
- Azizi Riviera 59Registered status: Finished
Al Merkadh · 123 units, 1 building
- Started
- 04 May 2023
- Current planned completion
- 14 Feb 2025
- Completed
- 14 Feb 2025
15 unit and villa sales in the year to Sep 2026
- AZIZI VISTARegistered status: Finished
Al Hebiah Second · 163 units, 1 building
- Started
- 27 Apr 2023
- Current planned completion
- 30 Apr 2025
- Completed
- 30 Sep 2025
55 unit and villa sales in the year to Sep 2026
- AZIZI AMBERRegistered status: Finished
Jabal Ali First · 115 units, 1 building
- Started
- 23 Mar 2023
- Current planned completion
- 31 Jul 2025
- Completed
- 31 Jul 2025
17 unit and villa sales in the year to Sep 2026
- AZIZI RIVIERA AZURERegistered status: Finished
Al Merkadh · 124 units, 1 building
- Started
- 08 Nov 2022
- Current planned completion
- 30 Jul 2025
- Completed
- 30 Jul 2025
17 unit and villa sales in the year to Sep 2026
- Azizi Riviera ReveRegistered status: Active76.6% complete
Al Merkadh · 455 units, 4 buildings
- Started
- 01 Jul 2022
- Current planned completion
- 05 Feb 2025
83 unit and villa sales in the year to Sep 2026
- AZIZI RIVIERA 65Registered status: Finished
Al Merkadh · 169 units, 1 building
- Started
- 05 Jun 2022
- Current planned completion
- 27 Mar 2025
- Completed
- 27 Mar 2025
30 unit and villa sales in the year to Sep 2026
- Azizi Riviera BeachfrontRegistered status: Finished
Al Merkadh · 609 units, 4 buildings
- Started
- 01 Apr 2021
- Current planned completion
- 30 Dec 2025
- Completed
- 31 Dec 2025
104 unit and villa sales in the year to Sep 2026
- Azizi Riviera 46Registered status: Finished
Al Merkadh · 418 units, 1 building
- Started
- 23 Nov 2020
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
30 unit and villa sales in the year to Sep 2026
- Azizi Riviera 45Registered status: Finished
Al Merkadh · 190 units, 1 building
- Started
- 23 Nov 2020
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
13 unit and villa sales in the year to Sep 2026
- Azizi Riviera 44Registered status: Finished
Al Merkadh · 279 units, 1 building
- Started
- 23 Nov 2020
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
20 unit and villa sales in the year to Sep 2026
- Azizi Riviera 36Registered status: Finished
Al Merkadh · 214 units, 1 building
- Started
- 23 Nov 2020
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
7 unit and villa sales in the year to Sep 2026
- Azizi Riviera 42Registered status: Finished
Al Merkadh · 185 units, 1 building
- Started
- 23 Nov 2020
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
11 unit and villa sales in the year to Sep 2026
- Azizi Riviera 43Registered status: Finished
Al Merkadh · 293 units, 1 building
- Started
- 23 Nov 2020
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
26 unit and villa sales in the year to Sep 2026
- Azizi Riviera 41Registered status: Finished
Al Merkadh · 248 units, 1 building
- Started
- 23 Nov 2020
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
28 unit and villa sales in the year to Sep 2026
- Azizi Riviera 47Registered status: Finished
Al Merkadh · 194 units, 1 building
- Started
- 23 Nov 2020
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
21 unit and villa sales in the year to Sep 2026
- Azizi Riviera 28Registered status: Finished
Al Merkadh · 243 units, 1 building
- Started
- 12 Dec 2018
- Current planned completion
- 12 Sep 2023
- Completed
- 12 Sep 2023
16 unit and villa sales in the year to Sep 2026
- Azizi Riviera 26Registered status: Finished
Al Merkadh · 270 units, 1 building
- Started
- 12 Dec 2018
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
15 unit and villa sales in the year to Sep 2026
- Azizi Riviera 24Registered status: Finished
Al Merkadh · 211 units, 1 building
- Started
- 12 Dec 2018
- Current planned completion
- 30 Mar 2023
- Completed
- 30 Mar 2023
10 unit and villa sales in the year to Sep 2026
- Azizi Riviera 27Registered status: Finished
Al Merkadh · 234 units, 1 building
- Started
- 12 Dec 2018
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
19 unit and villa sales in the year to Sep 2026
- Azizi Riviera 29Registered status: Finished
Al Merkadh · 176 units, 1 building
- Started
- 12 Dec 2018
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
10 unit and villa sales in the year to Sep 2026
- Azizi Riviera 30Registered status: Finished
Al Merkadh · 135 units, 1 building
- Started
- 12 Dec 2018
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
3 unit and villa sales in the year to Sep 2026
- Azizi Riviera 39Registered status: Finished
Al Merkadh · 171 units, 1 building
- Started
- 12 Dec 2018
- Current planned completion
- 04 Mar 2024
- Completed
- 04 Mar 2024
15 unit and villa sales in the year to Sep 2026
- Azizi Riviera 40Registered status: Finished
Al Merkadh · 165 units, 1 building
- Started
- 12 Dec 2018
- Current planned completion
- 16 May 2024
- Completed
- 16 May 2024
9 unit and villa sales in the year to Sep 2026
- Azizi Riviera 48Registered status: Finished
Al Merkadh · 335 units, 1 building
- Started
- 12 Dec 2018
- Current planned completion
- 04 Mar 2024
- Completed
- 04 Mar 2024
23 unit and villa sales in the year to Sep 2026
- Azizi Riviera 37Registered status: Finished
Al Merkadh · 241 units, 1 building
- Started
- 01 Jun 2018
- Current planned completion
- 04 Mar 2024
- Completed
- 04 Mar 2024
21 unit and villa sales in the year to Sep 2026
- Azizi Riviera 38Registered status: Finished
Al Merkadh · 161 units, 1 building
- Started
- 01 Jun 2018
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
12 unit and villa sales in the year to Sep 2026
- Fawad Azizi ResidenceRegistered status: Finished
Al Jadaf · 378 units, 1 building
- Started
- 10 May 2018
- Current planned completion
- 02 Apr 2024
- Completed
- 02 Apr 2024
45 unit and villa sales in the year to Sep 2026
- Azizi Riviera 31Registered status: Finished
Al Merkadh · 134 units, 1 building
- Started
- 15 Apr 2018
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
8 unit and villa sales in the year to Sep 2026
- Azizi Mirage 1Registered status: Finished
Al Hebiah Second · 762 units, 2 buildings
- Started
- 01 Feb 2018
- Current planned completion
- 30 Apr 2025
- Completed
- 16 Oct 2025
449 unit and villa sales in the year to Sep 2026
- Azizi GreenfieldRegistered status: Finished
Nad Al Shiba First · 102 units, 1 building
- Started
- 01 Feb 2018
- Current planned completion
- 08 Mar 2024
- Completed
- 08 Mar 2024
9 unit and villa sales in the year to Sep 2026
- Azizi GrandRegistered status: Active82.1% complete
Al Hebiah Fourth · 411 units, 1 building
- Started
- 01 Feb 2018
- Current planned completion
- 02 Feb 2025
188 unit and villa sales in the year to Sep 2026
- Azizi GardensRegistered status: Finished
Nad Al Shiba First · 82 units, 1 building
- Started
- 01 Feb 2018
- Current planned completion
- 11 Dec 2023
- Completed
- 11 Dec 2023
9 unit and villa sales in the year to Sep 2026
- Azizi Park AvenueRegistered status: Finished
Nad Al Shiba First · 124 units, 1 building
- Started
- 01 Feb 2018
- Current planned completion
- 18 Jan 2024
- Completed
- 18 Jan 2024
6 unit and villa sales in the year to Sep 2026
- Azizi Riviera 10Registered status: Finished
Al Merkadh · 131 units, 1 building
- Started
- 15 Dec 2017
- Current planned completion
- 30 Sep 2022
- Completed
- 23 Aug 2022
10 unit and villa sales in the year to Sep 2026
- Azizi Riviera 8Registered status: Finished
Al Merkadh · 216 units, 1 building
- Started
- 15 Dec 2017
- Current planned completion
- 07 Jun 2023
- Completed
- 07 Jun 2023
23 unit and villa sales in the year to Sep 2026
- Azizi Riviera 18Registered status: Finished
Al Merkadh · 282 units, 1 building
- Started
- 15 Dec 2017
- Current planned completion
- 14 Jul 2023
- Completed
- 14 Jul 2023
11 unit and villa sales in the year to Sep 2026
- Azizi Riviera 19Registered status: Finished
Al Merkadh · 207 units, 1 building
- Started
- 15 Dec 2017
- Current planned completion
- 16 Oct 2023
- Completed
- 16 Oct 2023
11 unit and villa sales in the year to Sep 2026
- Azizi Riviera 22Registered status: Finished
Al Merkadh · 157 units, 1 building
- Started
- 15 Dec 2017
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
7 unit and villa sales in the year to Sep 2026
- Azizi Riviera 14Registered status: Finished
Al Merkadh · 228 units, 1 building
- Started
- 01 Dec 2017
- Current planned completion
- 30 Sep 2022
- Completed
- 25 May 2023
21 unit and villa sales in the year to Sep 2026
- Azizi Riviera 25Registered status: Finished
Al Merkadh · 276 units, 1 building
- Started
- 15 Nov 2017
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
12 unit and villa sales in the year to Sep 2026
- Azizi Riviera 23Registered status: Finished
Al Merkadh · 248 units, 1 building
- Started
- 01 Nov 2017
- Current planned completion
- 31 Dec 2022
- Completed
- 31 Dec 2022
16 unit and villa sales in the year to Sep 2026
- Azizi Riviera 7Registered status: Finished
Al Merkadh · 158 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 23 Aug 2022
- Completed
- 23 Aug 2022
8 unit and villa sales in the year to Sep 2026
- Azizi Riviera 4Registered status: Finished
Al Merkadh · 212 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 30 Sep 2022
- Completed
- 31 Oct 2022
16 unit and villa sales in the year to Sep 2026
- Azizi Riviera 3Registered status: Finished
Al Merkadh · 301 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 16 May 2024
- Completed
- 16 May 2024
14 unit and villa sales in the year to Sep 2026
- Azizi Riviera 2Registered status: Finished
Al Merkadh · 62 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 30 Sep 2022
- Completed
- 30 Sep 2022
2 unit and villa sales in the year to Sep 2026
- Azizi Riviera 6Registered status: Finished
Al Merkadh · 160 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 30 Sep 2022
- Completed
- 30 Sep 2022
7 unit and villa sales in the year to Sep 2026
- Azizi Riviera 1Registered status: Finished
Al Merkadh · 378 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 25 Jul 2024
- Completed
- 25 Jul 2024
26 unit and villa sales in the year to Sep 2026
- Azizi Riviera 21Registered status: Finished
Al Merkadh · 157 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
5 unit and villa sales in the year to Sep 2026
- Azizi Riviera 20Registered status: Finished
Al Merkadh · 250 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 31 Dec 2022
- Completed
- 31 Dec 2022
11 unit and villa sales in the year to Sep 2026
- Azizi Riviera 12Registered status: Finished
Al Merkadh · 135 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 30 Sep 2022
- Completed
- 30 Sep 2022
10 unit and villa sales in the year to Sep 2026
- Azizi Riviera 11Registered status: Finished
Al Merkadh · 135 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 30 Sep 2022
- Completed
- 13 Sep 2022
8 unit and villa sales in the year to Sep 2026
- Azizi Riviera 15Registered status: Finished
Al Merkadh · 251 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 14 Jul 2023
- Completed
- 14 Jul 2023
11 unit and villa sales in the year to Sep 2026
- Azizi Riviera 13Registered status: Finished
Al Merkadh · 234 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 30 Apr 2022
- Completed
- 10 Nov 2022
10 unit and villa sales in the year to Sep 2026
- Azizi Riviera 33Registered status: Finished
Al Merkadh · 204 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 13 Sep 2023
- Completed
- 13 Sep 2023
19 unit and villa sales in the year to Sep 2026
- Azizi Riviera 35Registered status: Finished
Al Merkadh · 252 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 14 Sep 2023
- Completed
- 14 Sep 2023
12 unit and villa sales in the year to Sep 2026
- Azizi Riviera 32Registered status: Finished
Al Merkadh · 247 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
17 unit and villa sales in the year to Sep 2026
- Azizi Riviera 34Registered status: Finished
Al Merkadh · 250 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 14 Sep 2023
- Completed
- 14 Sep 2023
9 unit and villa sales in the year to Sep 2026
- Azizi Riviera 17Registered status: Finished
Al Merkadh · 211 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 30 Sep 2022
- Completed
- 30 Sep 2022
16 unit and villa sales in the year to Sep 2026
- Azizi Riviera 9Registered status: Finished
Al Merkadh · 231 units, 1 building
- Started
- 01 Oct 2017
- Current planned completion
- 22 Jun 2023
- Completed
- 22 Jun 2023
17 unit and villa sales in the year to Sep 2026
- Farhad Azizi ResidenceRegistered status: Finished
Al Jadaf · 662 units, 1 building
- Started
- 01 Jul 2017
- Current planned completion
- 14 Jul 2022
- Completed
- 14 Jul 2022
61 unit and villa sales in the year to Sep 2026
- Azizi PearlRegistered status: Finished
Jabal Ali First · 223 units, 1 building
- Started
- 01 Jul 2017
- Current planned completion
- 05 Jun 2024
- Completed
- 05 Jun 2024
28 unit and villa sales in the year to Sep 2026
- Azizi BertonRegistered status: Finished
Jabal Ali First · 250 units, 1 building
- Started
- 01 Jul 2017
- Current planned completion
- 08 Aug 2023
- Completed
- 08 Aug 2023
16 unit and villa sales in the year to Sep 2026
- Azizi Riviera 5Registered status: Finished
Al Merkadh · 221 units, 1 building
- Started
- 01 Jul 2017
- Current planned completion
- 25 May 2023
- Completed
- 25 May 2023
13 unit and villa sales in the year to Sep 2026
- Azizi Riviera 16Registered status: Finished
Al Merkadh · 262 units, 1 building
- Started
- 01 Jul 2017
- Current planned completion
- 30 Sep 2022
- Completed
- 30 Sep 2022
13 unit and villa sales in the year to Sep 2026
- Azizi Aura ResidencesRegistered status: Finished
Jabal Ali Industrial Second · 487 units, 1 building
- Started
- 01 May 2017
- Current planned completion
- 31 May 2020
- Completed
- 20 Dec 2020
52 unit and villa sales in the year to Sep 2026
- Azizi Aliyah ResidencesRegistered status: Finished
Al Jadaf · 359 units, 1 building
- Started
- 01 Oct 2016
- Current planned completion
- 31 Aug 2019
- Completed
- 30 Jun 2019
26 unit and villa sales in the year to Sep 2026
- Azizi Plaza Hotel ApartmentsRegistered status: Finished
Jabal Ali First · 448 units, 1 building
- Started
- 01 Sep 2016
- Current planned completion
- 31 May 2020
- Completed
- 03 Nov 2021
56 unit and villa sales in the year to Sep 2026
- Azizi Farishta ResidenceRegistered status: Finished
Jabal Ali First · 295 units, 1 building
- Started
- 01 Sep 2016
- Current planned completion
- 16 Mar 2020
- Completed
- 31 Mar 2020
25 unit and villa sales in the year to Sep 2026
- Azizi Samia ResidenceRegistered status: Finished
Jabal Ali First · 296 units, 1 building
- Started
- 01 Sep 2016
- Current planned completion
- 09 Jan 2020
- Completed
- 09 Jan 2020
34 unit and villa sales in the year to Sep 2026
- Azizi Star Hotel ApartmentsRegistered status: Finished
Jabal Ali First · 500 units, 1 building
- Started
- 01 Sep 2016
- Current planned completion
- 10 Jan 2022
- Completed
- 10 Jan 2022
56 unit and villa sales in the year to Sep 2026
- Azizi Shaista ResidenceRegistered status: Finished
Jabal Ali First · 297 units, 1 building
- Started
- 14 Aug 2016
- Current planned completion
- 17 Mar 2021
- Completed
- 17 Mar 2021
16 unit and villa sales in the year to Sep 2026
- Azizi MinaRegistered status: Finished
Palm Jumeirah · 184 units, 1 building
- Started
- 15 Jul 2016
- Current planned completion
- 14 Jan 2021
- Completed
- 07 Apr 2021
17 unit and villa sales in the year to Sep 2026
- Roy Mediterranean Hotel ApartmentsRegistered status: Finished
Jabal Ali First · 273 units, 1 building
- Started
- 15 May 2016
- Current planned completion
- 11 Mar 2018
- Completed
- 31 Jan 2018
28 unit and villa sales in the year to Sep 2026
- Montrell Hotel AprtmentsRegistered status: Finished
Jabal Ali First · 224 units, 1 building
- Started
- 15 May 2016
- Current planned completion
- 21 Mar 2018
- Completed
- 30 Jun 2018
18 unit and villa sales in the year to Sep 2026
- CANDACE ACACIA HOTEL APARTMENTSRegistered status: Finished
Jabal Ali First · 318 units, 1 building
- Started
- 01 Mar 2016
- Current planned completion
- 01 Nov 2017
- Completed
- 25 Nov 2017
26 unit and villa sales in the year to Sep 2026
- CANDACE ASTER HOTEL APARTMENTSRegistered status: Finished
Jabal Ali First · 229 units, 1 building
- Started
- 01 Mar 2016
- Current planned completion
- 20 Sep 2017
- Completed
- 20 Sep 2017
17 unit and villa sales in the year to Sep 2026
- ROYAL BAYRegistered status: Finished
Palm Jumeirah · 91 units, 1 building
- Started
- 06 May 2015
- Current planned completion
- 06 Jan 2017
- Completed
- 15 Aug 2017
9 unit and villa sales in the year to Sep 2026
- AZIZI. DAISYRegistered status: Finished
Jabal Ali First · 129 units, 1 building
- Started
- 30 Oct 2014
- Current planned completion
- 07 May 2016
- Completed
- 25 Jul 2017
8 unit and villa sales in the year to Sep 2026
- AZIZI. FREESIARegistered status: Finished
Jabal Ali First · 98 units, 1 building
- Started
- 30 Oct 2014
- Current planned completion
- 14 Nov 2016
- Completed
- 05 Jul 2017
12 unit and villa sales in the year to Sep 2026
- AZIZI. TULIPRegistered status: Finished
Jabal Ali First · 97 units, 1 building
- Started
- 30 Oct 2014
- Current planned completion
- 07 May 2016
- Completed
- 19 Aug 2017
3 unit and villa sales in the year to Sep 2026
- AZIZI. FEIROUZRegistered status: Finished
Jabal Ali First · 99 units, 2 buildings
- Started
- 02 Jun 2014
- Current planned completion
- 04 Sep 2016
- Completed
- 04 Sep 2016
10 unit and villa sales in the year to Sep 2026
- AZIZI. YASAMINERegistered status: Finished
Jabal Ali First · 109 units, 1 building
- Started
- 02 Jun 2014
- Current planned completion
- 26 Jul 2016
- Completed
- 26 Jul 2016
6 unit and villa sales in the year to Sep 2026
- Azizi. LiatrisRegistered status: Finished
Jabal Ali First · 129 units, 1 building
- Started
- 02 Jun 2014
- Current planned completion
- 23 Oct 2016
- Completed
- 23 Oct 2016
5 unit and villa sales in the year to Sep 2026
- Azizi. IrisRegistered status: Finished
Jabal Ali First · 99 units, 1 building
- Started
- 02 Jun 2014
- Current planned completion
- 22 Feb 2017
- Completed
- 09 Dec 2015
9 unit and villa sales in the year to Sep 2026
- AZIZI. ORCHIDRegistered status: Finished
Jabal Ali First · 99 units, 1 building
- Started
- 02 Jun 2014
- Current planned completion
- 30 Nov 2016
- Completed
- 30 Nov 2016
12 unit and villa sales in the year to Sep 2026
A project without a page on this site is named by its DLD project number.
Source: DLD projects register, read 11 Nov 2026.