Developer
EMAAR DEVELOPMENT P.J.S.C.
DLD developer number 1211Registered with DLD on 28 Aug 2017
On the DLD projects register
- Projects
- 110
- Live
- 52
- Completed
- 58
- Cancelled
- 0
- Planned completion in the next 12 months
- 3
- Started in 2026
- 19
No planned completion date has moved since we started checking in Oct 2026, across 110 projects.
These are the register's current dates. A planned date that moved before we started checking isn't recorded, so this page doesn't say whether a project finished on time.
Source: DLD developers and projects registers, read 11 Nov 2026.
Projects
Newest start first. Each bar runs from the start date to the register's current planned completion date.
- DLD project 4451Registered status: Not started0% complete
Al Yelayiss 5 · 199 land plots
- Started
- 16 Sep 2026
- Current planned completion
- 30 Jun 2030
- DLD project 4450Registered status: Not started0% complete
Al Yelayiss 5 · 290 land plots
- Started
- 16 Aug 2026
- Current planned completion
- 30 Jun 2030
- Palace by the BeachRegistered status: Not started0% complete
Marsa Dubai · 861 units, 2 buildings
- Started
- 25 May 2026
- Current planned completion
- 30 Nov 2031
- Salva The HeightsRegistered status: Active0.5% complete
Al Yelayiss 5 · 482 land plots
- Started
- 18 May 2026
- Current planned completion
- 31 Jul 2030
- Avarra by PalaceRegistered status: Not started0.1% complete
Business Bay · 694 units, 1 building
- Started
- 15 May 2026
- Current planned completion
- 30 Jun 2031
155 unit and villa sales in the year to Sep 2026
- Grand Polo - EquestraRegistered status: Active1% complete
Dubai Investment Park Second · 361 villas, 91 land plots
- Started
- 09 May 2026
- Current planned completion
- 31 Aug 2029
309 unit and villa sales in the year to Sep 2026
- DLD project 4375Registered status: Not started0% complete
Al Yufrah 1 · 156 villas
- Started
- 25 Apr 2026
- Current planned completion
- 31 Jan 2030
- Serro 2 The HeightsRegistered status: Active0.5% complete
Al Yelayiss 5 · 396 land plots
- Started
- 18 Apr 2026
- Current planned completion
- 31 May 2030
- DLD project 4374Registered status: Not started0% complete
Al Yufrah 1 · 176 villas
- Started
- 15 Apr 2026
- Current planned completion
- 28 Feb 2030
- The Valley - AlvaRegistered status: Not started0% complete
Al Yufrah 1 · 196 villas
- Started
- 31 Mar 2026
- Current planned completion
- 31 Mar 2030
- Mareva The OasisRegistered status: Active2.1% complete
Me'Aisem Second · 310 land plots
- Started
- 22 Mar 2026
- Current planned completion
- 28 Feb 2030
- Mareva 2 The OasisRegistered status: Active1.3% complete
Me'Aisem Second · 346 land plots
- Started
- 22 Mar 2026
- Current planned completion
- 28 Feb 2030
98 more projects
- Serro The HeightsRegistered status: Active0.5% complete
Al Yelayiss 5 · 382 land plots
- Started
- 19 Mar 2026
- Current planned completion
- 31 Mar 2030
- The Valley - AveliaRegistered status: Not started0.3% complete
Al Yufrah 1 · 138 land plots
- Started
- 16 Mar 2026
- Current planned completion
- 31 Dec 2029
- Grand Polo - EquiterraRegistered status: Active0.8% complete
Dubai Investment Park Second · 547 villas, 128 land plots
- Started
- 09 Mar 2026
- Current planned completion
- 31 Aug 2029
507 unit and villa sales in the year to Sep 2026
- Grand Polo - Chevalia Estate 2Registered status: Active4.1% complete
Dubai Investment Park Second · 123 land plots
- Started
- 16 Feb 2026
- Current planned completion
- 30 Jun 2029
- The Valley - OvelleRegistered status: Active2.4% complete
Al Yufrah 1 · 132 land plots
- Started
- 13 Feb 2026
- Current planned completion
- 31 Dec 2029
- Grand Polo - Equiterra 2Registered status: Active1% complete
Dubai Investment Park Second · 384 villas, 69 land plots
- Started
- 09 Feb 2026
- Current planned completion
- 31 Jul 2029
379 unit and villa sales in the year to Sep 2026
- DLD project 4277Registered status: Active1.1% complete
Me'Aisem Second · 256 land plots
- Started
- 22 Jan 2026
- Current planned completion
- 31 Dec 2029
- Grand Polo - SelvaraRegistered status: Active2.8% complete
Dubai Investment Park Second · 236 land plots
- Started
- 02 Nov 2025
- Current planned completion
- 30 Apr 2029
- Grand Polo - Selvara 2Registered status: Active4% complete
Dubai Investment Park Second · 245 land plots
- Started
- 02 Nov 2025
- Current planned completion
- 30 Apr 2029
- Grand Polo - Selvara 3Registered status: Active3% complete
Dubai Investment Park Second · 137 land plots
- Started
- 02 Nov 2025
- Current planned completion
- 31 May 2029
- Grand Polo - Selvara 4Registered status: Active2.9% complete
Dubai Investment Park Second · 172 land plots
- Started
- 02 Nov 2025
- Current planned completion
- 31 May 2029
- The Oasis - Palace Villas - OstraRegistered status: Active6.5% complete
Me'Aisem Second · 525 land plots
- Started
- 05 Aug 2025
- Current planned completion
- 30 Sep 2029
- THE BRISTOL Emaar BeachfrontRegistered status: Active5.8% complete
Marsa Dubai · 229 units, 1 building
- Started
- 08 May 2025
- Current planned completion
- 30 Sep 2029
2 unit and villa sales in the year to Sep 2026
- The Oasis - Address Villas - TierraRegistered status: Active6.8% complete
Me'Aisem Second · 486 land plots
- Started
- 07 May 2025
- Current planned completion
- 30 Jun 2029
- Grand Polo - Montura 2Registered status: Active5% complete
Dubai Investment Park Second · 205 land plots
- Started
- 30 Apr 2025
- Current planned completion
- 31 May 2029
- Grand Polo - Chevalia EstateRegistered status: Active2.3% complete
Dubai Investment Park Second · 79 land plots
- Started
- 27 Mar 2025
- Current planned completion
- 28 Feb 2029
- Grand Polo - MonturaRegistered status: Active11.1% complete
Dubai Investment Park Second · 210 land plots
- Started
- 13 Mar 2025
- Current planned completion
- 30 Jun 2029
- Grand Polo - Chevalia FieldsRegistered status: Active10% complete
Dubai Investment Park Second · 178 land plots
- Started
- 13 Mar 2025
- Current planned completion
- 30 Apr 2029
- Grand Polo - Montura 3Registered status: Active1.1% complete
Dubai Investment Park Second · 218 land plots
- Started
- 13 Mar 2025
- Current planned completion
- 30 Jun 2029
- The Valley - KaiaRegistered status: Active19.1% complete
Al Yufrah 1 · 156 villas, 21 land plots
- Started
- 28 Feb 2025
- Current planned completion
- 31 Jul 2028
4 unit and villa sales in the year to Sep 2026
- The Valley - EleaRegistered status: Active22% complete
Al Yufrah 1 · 128 villas, 31 land plots
- Started
- 28 Feb 2025
- Current planned completion
- 30 Jun 2028
1 unit or villa sale in the year to Sep 2026
- The Valley - Farm GroveRegistered status: Active10% complete
Al Yufrah 1 · 482 villas, 447 land plots
- Started
- 28 Feb 2025
- Current planned completion
- 31 Dec 2028
8 unit and villa sales in the year to Sep 2026
- The Valley - Farm Grove 2Registered status: Active9.8% complete
Al Yufrah 1 · 290 villas, 265 land plots
- Started
- 28 Feb 2025
- Current planned completion
- 31 Oct 2028
2 unit and villa sales in the year to Sep 2026
- The Valley - ElvaRegistered status: Active25.9% complete
Al Yufrah 1 · 244 villas, 60 land plots
- Started
- 28 Feb 2025
- Current planned completion
- 31 Oct 2028
12 unit and villa sales in the year to Sep 2026
- The Valley - Velora 2Registered status: Active40.3% complete
Al Yufrah 1 · 312 villas, 77 land plots
- Started
- 22 Nov 2024
- Current planned completion
- 31 Jul 2028
11 unit and villa sales in the year to Sep 2026
- The Valley - VinderaRegistered status: Active2% complete
Al Yufrah 1 · 745 villas, 113 land plots
- Started
- 22 Nov 2024
- Current planned completion
- 31 Dec 2028
577 unit and villa sales in the year to Sep 2026
- Marina CoveRegistered status: Active5.7% complete
Marsa Dubai · 227 units, 1 building
- Started
- 30 Oct 2024
- Current planned completion
- 30 Sep 2029
5 unit and villa sales in the year to Sep 2026
- The Valley - RiveraRegistered status: Active3.9% complete
Al Yufrah 1 · 378 villas, 188 land plots
- Started
- 23 Oct 2024
- Current planned completion
- 30 Nov 2028
8 unit and villa sales in the year to Sep 2026
- The Valley - VeneraRegistered status: Active51.7% complete
Al Yufrah 1 · 696 villas, 173 land plots
- Started
- 23 Sep 2024
- Current planned completion
- 30 Sep 2028
32 unit and villa sales in the year to Sep 2026
- The Valley - VeloraRegistered status: Active50.1% complete
Al Yufrah 1 · 488 villas, 121 land plots
- Started
- 23 Aug 2024
- Current planned completion
- 31 Aug 2028
18 unit and villa sales in the year to Sep 2026
- The Valley - Avena 2Registered status: Active42.9% complete
Al Yufrah 1 · 332 villas, 165 land plots
- Started
- 23 Jul 2024
- Current planned completion
- 31 Jul 2028
5 unit and villa sales in the year to Sep 2026
- The Valley - Farm Gardens 2Registered status: Active59.1% complete
Al Yufrah 1 · 255 land plots
- Started
- 27 Jun 2024
- Current planned completion
- Not published
- The Valley - AvenaRegistered status: Active24.5% complete
Al Yufrah 1 · 322 villas, 160 land plots
- Started
- 23 Jun 2024
- Current planned completion
- 30 Jun 2028
10 unit and villa sales in the year to Sep 2026
- The Valley - LilliaRegistered status: Finished
Al Yufrah 1 · 406 villas, 63 land plots
- Started
- 08 Jan 2024
- Current planned completion
- Not published
- Completed
- 20 Jul 2026
40 unit and villa sales in the year to Sep 2026
- The Valley - NimaRegistered status: Active80% complete
Al Yufrah 1 · 520 villas, 78 land plots
- Started
- 17 Nov 2023
- Current planned completion
- Not published
45 unit and villa sales in the year to Sep 2026
- The Valley - AlanaRegistered status: Active81.6% complete
Al Yufrah 1 · 322 villas, 160 land plots
- Started
- 02 Nov 2023
- Current planned completion
- Not published
29 unit and villa sales in the year to Sep 2026
- BAYVIEWRegistered status: Active63% complete
Marsa Dubai · 690 units, 3 buildings
- Started
- 15 Oct 2023
- Current planned completion
- 31 Jul 2028
33 unit and villa sales in the year to Sep 2026
- SEAPOINTRegistered status: Active36.8% complete
Marsa Dubai · 674 units, 3 buildings
- Started
- 12 Sep 2023
- Current planned completion
- 31 Mar 2028
26 unit and villa sales in the year to Sep 2026
- The Valley - RivanaRegistered status: Active95.2% complete
Al Yufrah 1 · 486 villas, 242 land plots
- Started
- 09 Sep 2023
- Current planned completion
- 31 Mar 2027
44 unit and villa sales in the year to Sep 2026
- Arabian Ranches lll - MayRegistered status: Finished
Wadi Al Safa 5 · 298 villas, 45 land plots
- Started
- 09 Aug 2023
- Current planned completion
- 30 Sep 2027
- Completed
- 11 Aug 2026
26 unit and villa sales in the year to Sep 2026
- Arabian Ranches lll - Anya 2Registered status: Finished
Wadi Al Safa 5 · 362 villas, 63 land plots
- Started
- 26 Jun 2023
- Current planned completion
- 30 Dec 2026
- Completed
- 09 Oct 2026
29 unit and villa sales in the year to Sep 2026
- Arabian Ranches lll - AnyaRegistered status: Finished
Wadi Al Safa 5 · 492 villas, 76 land plots
- Started
- 22 May 2023
- Current planned completion
- 31 Oct 2026
- Completed
- 09 Oct 2026
50 unit and villa sales in the year to Sep 2026
- The Valley - EloraRegistered status: Finished
Al Yufrah 1 · 430 villas, 72 land plots
- Started
- 27 Mar 2023
- Current planned completion
- 30 Sep 2026
- Completed
- 13 Mar 2026
57 unit and villa sales in the year to Sep 2026
- The Valley - Farm GardensRegistered status: Finished
Al Yufrah 1 · 145 land plots
- Started
- 16 Mar 2023
- Current planned completion
- 31 Aug 2026
- Completed
- 06 Apr 2026
- Arabian Ranches lll - RayaRegistered status: Finished
Wadi Al Safa 5 · 240 villas, 35 land plots
- Started
- 18 Feb 2023
- Current planned completion
- 30 Jun 2026
- Completed
- 29 Dec 2025
51 unit and villa sales in the year to Sep 2026
- Beachgate by AddressRegistered status: Finished
Marsa Dubai · 252 units, 1 building
- Started
- 23 Nov 2022
- Current planned completion
- 31 Dec 2026
- Completed
- 22 Sep 2026
13 unit and villa sales in the year to Sep 2026
- Address The BayRegistered status: Active70.1% complete
Marsa Dubai · 448 units, 1 building
- Started
- 10 Nov 2022
- Current planned completion
- 31 Dec 2026
29 unit and villa sales in the year to Sep 2026
- The Valley - OraniaRegistered status: Finished
Al Yufrah 1 · 308 villas, 35 land plots
- Started
- 22 Sep 2022
- Current planned completion
- 31 Dec 2025
- Completed
- 31 Dec 2025
86 unit and villa sales in the year to Sep 2026
- Arabian Ranches lll - Bliss 2Registered status: Finished
Wadi Al Safa 5 · 269 villas, 55 land plots
- Started
- 17 May 2022
- Current planned completion
- 30 Dec 2025
- Completed
- 18 Dec 2025
27 unit and villa sales in the year to Sep 2026
- Arabian Ranches lll - Elie Saab llRegistered status: Finished
Wadi Al Safa 5 · 130 land plots
- Started
- 27 Apr 2022
- Current planned completion
- 30 Nov 2025
- Completed
- 15 Sep 2025
- Arabian Ranches lll - Elie SaabRegistered status: Finished
Wadi Al Safa 5 · 128 land plots
- Started
- 28 Mar 2022
- Current planned completion
- 30 Sep 2025
- Completed
- 11 Sep 2025
- Beach MansionRegistered status: Finished
Marsa Dubai · 495 units, 2 buildings
- Started
- 28 Feb 2022
- Current planned completion
- 30 Dec 2025
- Completed
- 11 Nov 2025
64 unit and villa sales in the year to Sep 2026
- The Valley - TaliaRegistered status: Finished
Al Yufrah 1 · 330 villas, 52 land plots
- Started
- 20 Feb 2022
- Current planned completion
- 31 Mar 2025
- Completed
- 31 Mar 2025
72 unit and villa sales in the year to Sep 2026
- Arabian Ranches lll - June 2Registered status: Finished
Wadi Al Safa 5 · 35 villas, 17 land plots
- Started
- 10 Feb 2022
- Current planned completion
- 31 Oct 2024
- Completed
- 31 Oct 2024
3 unit and villa sales in the year to Sep 2026
- Arabian Ranches lll - JuneRegistered status: Finished
Wadi Al Safa 5 · 183 villas, 95 land plots
- Started
- 10 Feb 2022
- Current planned completion
- 30 Jun 2025
- Completed
- 30 Jun 2025
43 unit and villa sales in the year to Sep 2026
- The Valley-NaraRegistered status: Finished
Al Yufrah 1 · 372 villas, 56 land plots
- Started
- 01 Dec 2021
- Current planned completion
- 30 Dec 2024
- Completed
- 30 Dec 2024
84 unit and villa sales in the year to Sep 2026
- Arabian Ranches lll - CayaRegistered status: Finished
Wadi Al Safa 5 · 246 land plots
- Started
- 06 Nov 2021
- Current planned completion
- 19 Jan 2025
- Completed
- 19 Jan 2025
- Arabain Ranches lll - BlissRegistered status: Finished
Wadi Al Safa 5 · 332 villas, 25 land plots
- Started
- 05 Oct 2021
- Current planned completion
- 30 Nov 2024
- Completed
- 30 Nov 2024
44 unit and villa sales in the year to Sep 2026
- Palace Beach ResidenceRegistered status: Finished
Marsa Dubai · 552 units, 3 buildings
- Started
- 26 Sep 2021
- Current planned completion
- 31 Oct 2025
- Completed
- 31 Oct 2025
69 unit and villa sales in the year to Sep 2026
- Burj CrownRegistered status: Finished
Burj Khalifa · 433 units, 1 building
- Started
- 27 May 2020
- Current planned completion
- 17 Aug 2023
- Completed
- 17 Aug 2023
50 unit and villa sales in the year to Sep 2026
- BEACH ISLERegistered status: Finished
Marsa Dubai · 397 units, 2 buildings
- Started
- 30 Apr 2020
- Current planned completion
- 30 Apr 2023
- Completed
- 30 Apr 2023
22 unit and villa sales in the year to Sep 2026
- The Valley - EdenRegistered status: Finished
Al Yufrah 1 · 362 villas, 42 land plots
- Started
- 09 Mar 2020
- Current planned completion
- 03 Jun 2023
- Completed
- 03 Jun 2023
13 unit and villa sales in the year to Sep 2026
- Arabian Ranches lll - RubaRegistered status: Finished
Wadi Al Safa 5 · 430 villas, 64 land plots
- Started
- 18 Feb 2020
- Current planned completion
- 25 Mar 2023
- Completed
- 25 Mar 2023
12 unit and villa sales in the year to Sep 2026
- Arabian Ranches III - SpringRegistered status: Finished
Wadi Al Safa 5 · 154 villas, 29 land plots
- Started
- 15 Oct 2019
- Current planned completion
- 30 Oct 2022
- Completed
- 30 Oct 2022
9 unit and villa sales in the year to Sep 2026
- Grand Bleu Tower interiors by Elie SaabRegistered status: Finished
Marsa Dubai · 639 units, 3 buildings
- Started
- 10 Sep 2019
- Current planned completion
- 30 May 2023
- Completed
- 30 May 2023
66 unit and villa sales in the year to Sep 2026
- Arabian Ranches III - JOYRegistered status: Finished
Wadi Al Safa 5 · 486 villas, 83 land plots
- Started
- 15 Aug 2019
- Current planned completion
- 30 Aug 2022
- Completed
- 30 Aug 2022
32 unit and villa sales in the year to Sep 2026
- Arabian Ranches III - SUNRegistered status: Finished
Wadi Al Safa 5 · 432 villas, 76 land plots
- Started
- 15 Jun 2019
- Current planned completion
- 16 Dec 2022
- Completed
- 16 Dec 2022
17 unit and villa sales in the year to Sep 2026
- AR II Camelia 2Registered status: Finished
Wadi Al Safa 7 · 168 villas, 28 land plots
- Started
- 15 Mar 2019
- Current planned completion
- 17 Nov 2021
- Completed
- 17 Nov 2021
8 unit and villa sales in the year to Sep 2026
- AR II CameliaRegistered status: Finished
Wadi Al Safa 7 · 258 villas, 43 land plots
- Started
- 27 Jan 2019
- Current planned completion
- 07 Jan 2022
- Completed
- 07 Jan 2022
8 unit and villa sales in the year to Sep 2026
- MARINA VISTARegistered status: Finished
Marsa Dubai · 625 units, 3 buildings
- Started
- 27 Dec 2018
- Current planned completion
- 30 Mar 2023
- Completed
- 30 Mar 2023
36 unit and villa sales in the year to Sep 2026
- SUNRISE BAYRegistered status: Finished
Marsa Dubai · 461 units, 3 buildings
- Started
- 07 Jun 2018
- Current planned completion
- 31 Oct 2021
- Completed
- 31 Oct 2021
32 unit and villa sales in the year to Sep 2026
- BEACH VISTARegistered status: Finished
Marsa Dubai · 466 units, 3 buildings
- Started
- 19 Mar 2018
- Current planned completion
- 06 Jan 2022
- Completed
- 06 Jan 2022
25 unit and villa sales in the year to Sep 2026
- GrandeRegistered status: Finished
Burj Khalifa · 906 units, 4 buildings
- Started
- 24 Oct 2017
- Current planned completion
- 30 Jun 2022
- Completed
- 30 Jun 2022
63 unit and villa sales in the year to Sep 2026
- Vida Dubai MallRegistered status: Finished
Burj Khalifa · 621 units, 3 buildings
- Started
- 18 Oct 2017
- Current planned completion
- 30 Dec 2022
- Completed
- 27 Feb 2022
46 unit and villa sales in the year to Sep 2026
- Downtown Views IIRegistered status: Finished
Zaabeel Second · 1,515 units, 3 buildings
- Started
- 06 May 2017
- Current planned completion
- 31 Aug 2022
- Completed
- 31 Aug 2022
92 unit and villa sales in the year to Sep 2026
- VIDA Residences Dubai MarinaRegistered status: Finished
Marsa Dubai · 364 units, 1 building
- Started
- 25 Apr 2017
- Current planned completion
- 30 Nov 2022
- Completed
- 01 Feb 2022
28 unit and villa sales in the year to Sep 2026
- THE ADDRESS DUBAI OPERARegistered status: Finished
Burj Khalifa · 873 units, 3 buildings
- Started
- 02 Apr 2017
- Current planned completion
- 30 Mar 2023
- Completed
- 30 Mar 2023
73 unit and villa sales in the year to Sep 2026
- AR II - Reem CommunityRegistered status: Finished
Wadi Al Safa 7 · 131 villas, 44 land plots
- Started
- 01 Apr 2017
- Current planned completion
- 13 Jan 2020
- Completed
- 09 Dec 2019
8 unit and villa sales in the year to Sep 2026
- The St. Regis Residences, Downtown DubaiRegistered status: Active76.1% complete
Burj Khalifa · 1,108 units, 3 buildings
- Started
- 28 Feb 2017
- Current planned completion
- 25 Dec 2026
128 unit and villa sales in the year to Sep 2026
- ACT ONE | ACT TWORegistered status: Finished
Burj Khalifa · 787 units, 3 buildings
- Started
- 12 Feb 2017
- Current planned completion
- 26 Dec 2022
- Completed
- 20 Jan 2022
54 unit and villa sales in the year to Sep 2026
- Il PRIMORegistered status: Finished
Burj Khalifa · 137 units, 1 building
- Started
- 01 Nov 2016
- Current planned completion
- 09 Dec 2022
- Completed
- 09 Dec 2022
12 unit and villa sales in the year to Sep 2026
- 5242Registered status: Finished
Marsa Dubai · 493 units, 3 buildings
- Started
- 07 Oct 2016
- Current planned completion
- 05 Sep 2020
- Completed
- 05 Sep 2020
25 unit and villa sales in the year to Sep 2026
- FORTERegistered status: Finished
Burj Khalifa · 927 units, 3 buildings
- Started
- 01 Sep 2016
- Current planned completion
- 29 Nov 2022
- Completed
- 29 Nov 2022
72 unit and villa sales in the year to Sep 2026
- DOWNTOWN VIEWSRegistered status: Finished
Zaabeel Second · 479 units, 1 building
- Started
- 15 May 2016
- Current planned completion
- 21 Jun 2021
- Completed
- 21 Jun 2021
31 unit and villa sales in the year to Sep 2026
- BLVD HEIGHTSRegistered status: Finished
Burj Khalifa · 558 units, 3 buildings
- Started
- 01 Dec 2015
- Current planned completion
- 30 Apr 2020
- Completed
- 30 Apr 2020
29 unit and villa sales in the year to Sep 2026
- Opera GrandRegistered status: Finished
Burj Khalifa · 306 units, 1 building
- Started
- 01 Jun 2015
- Current planned completion
- 09 Dec 2021
- Completed
- 09 Dec 2021
25 unit and villa sales in the year to Sep 2026
- ASEELRegistered status: Finished
Wadi Al Safa 6 · 47 villas, 55 land plots
- Started
- 01 Jun 2015
- Current planned completion
- 31 Oct 2018
- Completed
- 31 Oct 2018
10 unit and villa sales in the year to Sep 2026
- BLVD CRESCENTRegistered status: Finished
Burj Khalifa · 365 units, 3 buildings
- Started
- 06 Mar 2015
- Current planned completion
- 27 May 2019
- Completed
- 31 Jul 2018
16 unit and villa sales in the year to Sep 2026
- ARABIAN RANCHES- AZALEA COMMUNITYRegistered status: Finished
Wadi Al Safa 7 · 103 villas, 109 land plots
- Started
- 29 Jan 2015
- Current planned completion
- 19 May 2019
- Completed
- 19 May 2019
9 unit and villa sales in the year to Sep 2026
- VIDA RESIDENCE DOWNTOWN DUBAIRegistered status: Finished
Burj Khalifa · 347 units, 1 building
- Started
- 01 Jan 2015
- Current planned completion
- 03 Mar 2019
- Completed
- 31 May 2018
40 unit and villa sales in the year to Sep 2026
- BURJ VISTARegistered status: Finished
Burj Khalifa · 790 units, 5 buildings
- Started
- 01 Jan 2014
- Current planned completion
- 01 Apr 2017
- Completed
- 01 Apr 2017
37 unit and villa sales in the year to Sep 2026
- The HillsRegistered status: Finished
Al Thanyah Third · 590 units, 5 buildings, 1 land plot
- Started
- 01 Nov 2013
- Current planned completion
- 15 Apr 2019
- Completed
- 15 Apr 2019
39 unit and villa sales in the year to Sep 2026
- THE ADDRESS RESIDENCE - SKY VIEWRegistered status: Finished
Burj Khalifa · 708 units, 5 buildings
- Started
- 01 Aug 2013
- Current planned completion
- 30 Sep 2019
- Completed
- 30 Sep 2019
44 unit and villa sales in the year to Sep 2026
- The Address Residence-Fountain ViewsRegistered status: Finished
Burj Khalifa · 286 units, 1 building
- Started
- 08 Jun 2013
- Current planned completion
- 16 Jan 2019
- Completed
- 16 Jan 2019
26 unit and villa sales in the year to Sep 2026
- THE ADDRESS RESIDENCE FOUNTAIN VIEWS IIRegistered status: Finished
Burj Khalifa · 289 units, 1 building
- Started
- 08 Jun 2013
- Current planned completion
- 22 Jul 2019
- Completed
- 22 Jul 2019
28 unit and villa sales in the year to Sep 2026
- ARABIAN RANCHES - SAMARA COMMUNITYRegistered status: Finished
Wadi Al Safa 7 · 2 buildings, 177 land plots
- Started
- 01 May 2013
- Current planned completion
- 01 Oct 2017
- Completed
- 01 Oct 2017
6 unit and villa sales in the year to Sep 2026
- THE ADDRESS RESIDENCE FOUNTAIN VIEWS IIIRegistered status: Finished
Burj Khalifa · 209 units, 1 building
- Started
- 01 May 2013
- Current planned completion
- 25 Sep 2019
- Completed
- 31 Dec 2016
23 unit and villa sales in the year to Sep 2026
- Boulevard PointRegistered status: Finished
Burj Khalifa · 449 units, 1 building
- Started
- 08 Jan 2013
- Current planned completion
- 10 Feb 2020
- Completed
- 17 Dec 2019
34 unit and villa sales in the year to Sep 2026
A project without a page on this site is named by its DLD project number.
Source: DLD projects register, read 11 Nov 2026.