Developer
Binghatti Developers FZE
DLD developer number 1051Registered with DLD on 06 Jan 2015
On the DLD projects register
- Projects
- 85
- Live
- 42
- Completed
- 43
- Cancelled
- 0
- Planned completion in the next 12 months
- 18
- Started in 2026
- 16
Planned completion dates moved 2 times since we started checking in Oct 2026, across 2 of 85 projects.
These are the register's current dates. A planned date that moved before we started checking isn't recorded, so this page doesn't say whether a project finished on time.
Source: DLD developers and projects registers, read 11 Nov 2026.
Projects
Newest start first. Each bar runs from the start date to the register's current planned completion date.
- DLD project 4471Registered status: Pending0% complete
Al Rowaiyah First · 1,432 villas, 523 land plots
- Started
- 15 Nov 2026
- Current planned completion
- 31 Dec 2029
- Binghatti SpectreRegistered status: Not started0% complete
Al Jadaf · 966 units, 2 buildings
- Started
- 01 Sep 2026
- Current planned completion
- 31 Dec 2028
- Vision IconicRegistered status: Not started0% complete
Nad Al Shiba First · 1,453 units, 1 building
- Started
- 01 Aug 2026
- Current planned completion
- 15 Dec 2028
4 unit and villa sales in the year to Sep 2026
- Binghatti WraithRegistered status: Not started0% complete
Al Jadaf · 881 units, 1 building
- Started
- 01 Jul 2026
- Current planned completion
- 30 Dec 2027
45 unit and villa sales in the year to Sep 2026
- Binghatti StarfallRegistered status: Not started0% complete
Al Jadaf · 771 units, 1 building
- Started
- 01 Jul 2026
- Current planned completion
- 30 Sep 2028
Planned date moved once since we started checking in Oct 2026
- DLD project 4405Registered status: Pending0% complete
Wadi Al Safa 3 · 160 units, 1 building
- Started
- 01 Mar 2026
- Current planned completion
- 30 Jun 2027
- DLD project 4408Registered status: Pending0% complete
Wadi Al Safa 3 · 350 units, 4 buildings
- Started
- 01 Mar 2026
- Current planned completion
- 30 Jun 2027
- DLD project 4409Registered status: Pending0% complete
Wadi Al Safa 3 · 517 units, 2 buildings
- Started
- 01 Mar 2026
- Current planned completion
- 30 Jun 2027
- Binghatti Skyflame 1Registered status: Not started0% complete
Wadi Al Safa 3 · 1,407 units, 1 building
- Started
- 01 Feb 2026
- Current planned completion
- 31 Dec 2027
763 unit and villa sales in the year to Sep 2026
- Binghatti Skyflame 2Registered status: Not started0% complete
Wadi Al Safa 3 · 801 units, 1 building
- Started
- 01 Feb 2026
- Current planned completion
- 31 Dec 2027
410 unit and villa sales in the year to Sep 2026
- Project MaybachRegistered status: Not started0% complete
Nad Al Shiba First · 831 units, 1 building
- Started
- 14 Jan 2026
- Current planned completion
- 30 Jun 2027
205 unit and villa sales in the year to Sep 2026
- Maybach Ultimate LuxuryRegistered status: Not started0% complete
Nad Al Shiba First · 1,233 units, 2 buildings
- Started
- 14 Jan 2026
- Current planned completion
- 31 Aug 2027
236 unit and villa sales in the year to Sep 2026
73 more projects
- Maybach SixRegistered status: Not started0% complete
Nad Al Shiba First · 1,878 units, 2 buildings
- Started
- 14 Jan 2026
- Current planned completion
- 31 Aug 2027
1,039 unit and villa sales in the year to Sep 2026
- Binghatti LuxuriaRegistered status: Active7% complete
Al Barsha South Fifth · 469 units, 1 building
- Started
- 01 Jan 2026
- Current planned completion
- 30 Jul 2027
171 unit and villa sales in the year to Sep 2026
- Binghatti EthereaRegistered status: Active7.2% complete
Al Barsha South Fourth · 287 units, 1 building
- Started
- 01 Jan 2026
- Current planned completion
- 31 Dec 2027
61 unit and villa sales in the year to Sep 2026
- Binghatti SkyterracesRegistered status: Not started0% complete
Al Hebiah First · 1,886 units, 1 building
- Started
- 01 Jan 2026
- Current planned completion
- 31 Oct 2027
623 unit and villa sales in the year to Sep 2026
- Binghatti CullinanRegistered status: Not started0% complete
Al Jadaf · 652 units, 1 building
- Started
- 01 Dec 2025
- Current planned completion
- 30 Jun 2027
503 unit and villa sales in the year to Sep 2026
- Binghatti VintageRegistered status: Not started0% complete
Wadi Al Safa 3 · 1,572 units, 1 building
- Started
- 01 Oct 2025
- Current planned completion
- 31 Mar 2027
1,511 unit and villa sales in the year to Sep 2026
- Binghatti TitaniaRegistered status: Not started0% complete
Wadi Al Safa 3 · 789 units, 1 building
- Started
- 01 Oct 2025
- Current planned completion
- 28 Feb 2027
720 unit and villa sales in the year to Sep 2026
- Binghatti HillcrestRegistered status: Active60% complete
Al Barshaa South Third · 396 units, 1 building
- Started
- 01 Oct 2025
- Current planned completion
- 31 Dec 2026
Planned date moved once since we started checking in Oct 2026
233 unit and villa sales in the year to Sep 2026
- Binghatti Flare 01Registered status: Active20% complete
Al Barsha South Fifth · 845 units, 1 building
- Started
- 15 Jul 2025
- Current planned completion
- 14 Jul 2027
663 unit and villa sales in the year to Sep 2026
- Binghatti Flare 02Registered status: Active17.8% complete
Al Barsha South Fifth · 613 units, 1 building
- Started
- 15 Jul 2025
- Current planned completion
- 15 Jun 2027
566 unit and villa sales in the year to Sep 2026
- Binghatti CircleRegistered status: Active22.1% complete
Al Barsha South Fourth · 822 units, 1 building
- Started
- 01 Jun 2025
- Current planned completion
- 31 May 2027
350 unit and villa sales in the year to Sep 2026
- DLD project 4043Registered status: Pending4.3% complete
Palm Jumeirah · 77 units, 1 building
- Started
- 01 Jun 2025
- Current planned completion
- 30 Apr 2027
- Binghatti MoonlightRegistered status: Active19.2% complete
Al Jadaf · 286 units, 1 building
- Started
- 15 Apr 2025
- Current planned completion
- 15 Jun 2026
256 unit and villa sales in the year to Sep 2026
- Binghatti TwilightRegistered status: Active55.4% complete
Al Jadaf · 277 units, 1 building
- Started
- 01 Apr 2025
- Current planned completion
- 30 Apr 2026
129 unit and villa sales in the year to Sep 2026
- Binghatti AquariseRegistered status: Active21% complete
Business Bay · 1,592 units, 5 buildings
- Started
- 15 Mar 2025
- Current planned completion
- 31 Oct 2026
597 unit and villa sales in the year to Sep 2026
- Binghatti AmberhallRegistered status: Active70% complete
Al Barsha South Fourth · 710 units, 1 building
- Started
- 15 Feb 2025
- Current planned completion
- 28 Feb 2026
535 unit and villa sales in the year to Sep 2026
- Binghatti SkyhallRegistered status: Active31.1% complete
Business Bay · 728 units, 1 building
- Started
- 01 Feb 2025
- Current planned completion
- 31 Aug 2026
231 unit and villa sales in the year to Sep 2026
- Binghatti SkybladeRegistered status: Active17.1% complete
Burj Khalifa · 596 units, 1 building
- Started
- 01 Feb 2025
- Current planned completion
- 30 Nov 2027
566 unit and villa sales in the year to Sep 2026
- Binghatti HillsideRegistered status: Active80% complete
Al Barshaa South Second · 411 units, 1 building
- Started
- 31 Jan 2025
- Current planned completion
- 30 Jun 2026
254 unit and villa sales in the year to Sep 2026
- Binghatti RubyRegistered status: Active65% complete
Al Barsha South Fourth · 628 units, 1 building
- Started
- 01 Jan 2025
- Current planned completion
- 28 Feb 2026
227 unit and villa sales in the year to Sep 2026
- Binghatti HavenRegistered status: Active76.1% complete
Al Hebiah Fourth · 501 units, 1 building
- Started
- 17 Dec 2024
- Current planned completion
- 31 Mar 2026
217 unit and villa sales in the year to Sep 2026
- Binghatti EliteRegistered status: Active53.3% complete
Me'Aisem First · 1,745 units, 1 building
- Started
- 30 Nov 2024
- Current planned completion
- 30 Jun 2026
182 unit and villa sales in the year to Sep 2026
- Binghatti SkyriseRegistered status: Active35.9% complete
Business Bay · 3,358 units, 4 buildings
- Started
- 15 Oct 2024
- Current planned completion
- 31 Dec 2026
432 unit and villa sales in the year to Sep 2026
- Binghatti IvoryRegistered status: Finished
Al Jadaf · 332 units, 1 building
- Started
- 01 Oct 2024
- Current planned completion
- 31 Dec 2025
- Completed
- 15 Sep 2026
66 unit and villa sales in the year to Sep 2026
- Binghatti GroveRegistered status: Finished
Al Barsha South Fourth · 404 units, 1 building
- Started
- 01 Oct 2024
- Current planned completion
- 31 Mar 2026
- Completed
- 01 Oct 2026
71 unit and villa sales in the year to Sep 2026
- Binghatti HillviewsRegistered status: Active32.6% complete
Al Barshaa South Second · 1,575 units, 1 building
- Started
- 01 Oct 2024
- Current planned completion
- 01 Apr 2026
487 unit and villa sales in the year to Sep 2026
- Binghatti PinnacleRegistered status: Finished
Al Jadaf · 178 units, 1 building
- Started
- 01 Sep 2024
- Current planned completion
- 31 Dec 2025
- Completed
- 30 Jul 2026
152 unit and villa sales in the year to Sep 2026
- Binghatti AuroraRegistered status: Finished
Al Barsha South Fourth · 275 units, 1 building
- Started
- 01 Aug 2024
- Current planned completion
- 31 Dec 2025
- Completed
- 15 Oct 2025
73 unit and villa sales in the year to Sep 2026
- Binghatti GhostRegistered status: Finished
Al Jadaf · 785 units, 1 building
- Started
- 31 Jul 2024
- Current planned completion
- 31 Mar 2026
- Completed
- 23 Sep 2026
153 unit and villa sales in the year to Sep 2026
- Binghatti StarlightRegistered status: Active63.1% complete
Al Jadaf · 511 units, 1 building
- Started
- 30 Jul 2024
- Current planned completion
- 31 Mar 2026
206 unit and villa sales in the year to Sep 2026
- Binghatti ApexRegistered status: Finished
Al Barsha South Fourth · 552 units, 1 building
- Started
- 01 May 2024
- Current planned completion
- 30 Apr 2026
- Completed
- 23 Apr 2026
271 unit and villa sales in the year to Sep 2026
- Binghatti HillsRegistered status: Active90% complete
Al Barshaa South Second · 1,701 units, 2 buildings
- Started
- 01 Apr 2024
- Current planned completion
- Not published
352 unit and villa sales in the year to Sep 2026
- One by BinghattiRegistered status: Active50.2% complete
Business Bay · 755 units, 1 building
- Started
- 01 Mar 2024
- Current planned completion
- 30 May 2026
209 unit and villa sales in the year to Sep 2026
- Binghatti PhantomRegistered status: Finished
Al Barsha South Fourth · 369 units, 1 building
- Started
- 15 Feb 2024
- Current planned completion
- Not published
- Completed
- 06 Oct 2025
50 unit and villa sales in the year to Sep 2026
- Binghatti PhoenixRegistered status: Finished
Al Barsha South Fourth · 464 units, 1 building
- Started
- 01 Feb 2024
- Current planned completion
- Not published
- Completed
- 15 Oct 2025
103 unit and villa sales in the year to Sep 2026
- Binghatti RoyaleRegistered status: Finished
Al Barsha South Fourth · 370 units, 1 building
- Started
- 14 Jan 2024
- Current planned completion
- Not published
- Completed
- 15 Oct 2025
149 unit and villa sales in the year to Sep 2026
- Dawn by BinghattiRegistered status: Finished
Al Barsha South Fourth · 97 units, 1 building
- Started
- 01 Jan 2024
- Current planned completion
- 30 Dec 2024
- Completed
- 19 May 2025
5 unit and villa sales in the year to Sep 2026
- Dusk by BinghattiRegistered status: Finished
Al Barsha South Fourth · 107 units, 1 building
- Started
- 01 Jan 2024
- Current planned completion
- 31 Dec 2024
- Completed
- 31 Dec 2024
11 unit and villa sales in the year to Sep 2026
- Mercedes-Benz Places | BinghattiRegistered status: Active65.3% complete
Burj Khalifa · 163 units, 1 building
- Started
- 15 Dec 2023
- Current planned completion
- 31 Dec 2026
33 unit and villa sales in the year to Sep 2026
- Binghatti AzureRegistered status: Finished
Al Barsha South Fourth · 650 units, 1 building
- Started
- 15 Dec 2023
- Current planned completion
- 31 Dec 2024
- Completed
- 31 Dec 2024
138 unit and villa sales in the year to Sep 2026
- Binghatti LavenderRegistered status: Finished
Al Barsha South Fourth · 166 units, 1 building
- Started
- 15 Nov 2023
- Current planned completion
- 29 Oct 2024
- Completed
- 29 Oct 2024
13 unit and villa sales in the year to Sep 2026
- Binghatti TulipRegistered status: Finished
Al Barsha South Fourth · 279 units, 1 building
- Started
- 25 Oct 2023
- Current planned completion
- Not published
- Completed
- 24 Mar 2025
41 unit and villa sales in the year to Sep 2026
- Binghatti GalaxyRegistered status: Finished
Al Barsha South Fourth · 147 units, 2 buildings
- Started
- 30 Sep 2023
- Current planned completion
- Not published
- Completed
- 10 Mar 2025
13 unit and villa sales in the year to Sep 2026
- Binghatti OrchidRegistered status: Finished
Al Barsha South Fourth · 314 units, 1 building
- Started
- 01 Aug 2023
- Current planned completion
- Not published
- Completed
- 20 Dec 2024
39 unit and villa sales in the year to Sep 2026
- Binghatti VenusRegistered status: Finished
Al Barsha South Fourth · 191 units, 1 building
- Started
- 01 Jun 2023
- Current planned completion
- 31 Aug 2024
- Completed
- 31 Aug 2024
16 unit and villa sales in the year to Sep 2026
- Binghatti AmberRegistered status: Finished
Al Barsha South Fourth · 658 units, 1 building
- Started
- 01 Jun 2023
- Current planned completion
- 30 Oct 2024
- Completed
- 30 Oct 2024
66 unit and villa sales in the year to Sep 2026
- Binghatti GardeniaRegistered status: Finished
Al Barsha South Fourth · 308 units, 1 building
- Started
- 25 May 2023
- Current planned completion
- 25 Jul 2024
- Completed
- 25 Jul 2024
37 unit and villa sales in the year to Sep 2026
- Binghatti HouseRegistered status: Finished
Al Barsha South Fourth · 294 units, 1 building
- Started
- 15 May 2023
- Current planned completion
- 25 Jul 2024
- Completed
- 25 Jul 2024
39 unit and villa sales in the year to Sep 2026
- Binghatti OnyxRegistered status: Finished
Al Barsha South Fourth · 507 units, 1 building
- Started
- 23 Mar 2023
- Current planned completion
- 01 Oct 2024
- Completed
- 01 Oct 2024
71 unit and villa sales in the year to Sep 2026
- Bugatti Residences by BinghattiRegistered status: Active65.6% complete
Business Bay · 187 units, 1 building
- Started
- 01 Mar 2023
- Current planned completion
- 31 Dec 2025
33 unit and villa sales in the year to Sep 2026
- Trillionaire Residences by BinghattiRegistered status: Finished
Business Bay · 369 units, 1 building
- Started
- 01 Jan 2023
- Current planned completion
- 30 Jun 2024
- Completed
- 30 Jun 2024
37 unit and villa sales in the year to Sep 2026
- Binghatti EmeraldRegistered status: Finished
Al Barsha South Fourth · 328 units, 1 building
- Started
- 15 Dec 2022
- Current planned completion
- 28 Feb 2024
- Completed
- 28 Feb 2024
27 unit and villa sales in the year to Sep 2026
- Binghatti CrescentRegistered status: Finished
Al Barsha South Fourth · 170 units, 1 building
- Started
- 15 Oct 2022
- Current planned completion
- 26 Oct 2023
- Completed
- 26 Oct 2023
17 unit and villa sales in the year to Sep 2026
- Binghatti CornerRegistered status: Finished
Al Barsha South Fourth · 727 units, 1 building
- Started
- 01 Oct 2022
- Current planned completion
- 31 Mar 2024
- Completed
- 31 Mar 2024
62 unit and villa sales in the year to Sep 2026
- DLD project 2480Registered status: Active52.1% complete
Business Bay · 325 units, 1 building
- Started
- 01 Oct 2022
- Current planned completion
- 30 Jun 2026
- Binghatti CrestRegistered status: Finished
Al Barsha South Fourth · 171 units, 1 building
- Started
- 15 Sep 2022
- Current planned completion
- 31 Oct 2023
- Completed
- 31 Oct 2023
19 unit and villa sales in the year to Sep 2026
- Binghatti NovaRegistered status: Finished
Al Barsha South Fourth · 211 units, 1 building
- Started
- 15 Sep 2022
- Current planned completion
- 31 Oct 2023
- Completed
- 31 Oct 2023
11 unit and villa sales in the year to Sep 2026
- Binghatti LunaRegistered status: Finished
Al Barsha South Fourth · 212 units, 1 building
- Started
- 01 Sep 2022
- Current planned completion
- 31 Oct 2023
- Completed
- 31 Oct 2023
10 unit and villa sales in the year to Sep 2026
- Binghatti HeightsRegistered status: Finished
Al Barsha South Fourth · 366 units, 1 building
- Started
- 13 Jun 2022
- Current planned completion
- 15 Aug 2023
- Completed
- 15 Aug 2023
31 unit and villa sales in the year to Sep 2026
- Binghatti CreekRegistered status: Finished
Al Jadaf · 335 units, 1 building
- Started
- 07 Feb 2022
- Current planned completion
- 30 Apr 2023
- Completed
- 30 Apr 2023
20 unit and villa sales in the year to Sep 2026
- Binghatti CanalRegistered status: Finished
Business Bay · 306 units, 1 building
- Started
- 28 Jan 2022
- Current planned completion
- 30 Jun 2023
- Completed
- 30 Jun 2023
31 unit and villa sales in the year to Sep 2026
- Binghatti JasmineRegistered status: Finished
Al Barsha South Fourth · 92 units, 1 building
- Started
- 01 Jan 2022
- Current planned completion
- 31 Jan 2023
- Completed
- 31 Jan 2023
8 unit and villa sales in the year to Sep 2026
- Binghatti GemsRegistered status: Finished
Al Barsha South Fourth · 77 units, 1 building
- Started
- 08 Apr 2021
- Current planned completion
- 30 Jun 2022
- Completed
- 30 Jun 2022
4 unit and villa sales in the year to Sep 2026
- Binghatti RoseRegistered status: Finished
Al Barsha South Fourth · 171 units, 1 building
- Started
- 01 Apr 2021
- Current planned completion
- 30 Apr 2022
- Completed
- 30 Apr 2022
6 unit and villa sales in the year to Sep 2026
- Binghatti MirageRegistered status: Finished
Al Barsha South Fourth · 160 units, 1 building
- Started
- 10 Jan 2021
- Current planned completion
- 19 Jun 2022
- Completed
- 19 Jun 2022
10 unit and villa sales in the year to Sep 2026
- Binghatti GateRegistered status: Finished
Al Barsha South Fourth · 132 units, 1 building
- Started
- 01 Nov 2020
- Current planned completion
- 17 Jan 2022
- Completed
- 17 Jan 2022
12 unit and villa sales in the year to Sep 2026
- Binghatti AvenueRegistered status: Finished
Al Jadaf · 639 units, 1 building
- Started
- 01 Oct 2019
- Current planned completion
- 26 Apr 2022
- Completed
- 26 Apr 2022
52 unit and villa sales in the year to Sep 2026
- Binghatti PointRegistered status: Finished
Nadd Hessa · 127 units, 1 building
- Started
- 01 Mar 2019
- Current planned completion
- 03 Feb 2022
- Completed
- 03 Feb 2022
8 unit and villa sales in the year to Sep 2026
- Binghatti GatewayRegistered status: Finished
Al Jadaf · 182 units, 1 building
- Started
- 15 Jan 2019
- Current planned completion
- 30 Jun 2021
- Completed
- 30 Jun 2021
10 unit and villa sales in the year to Sep 2026
- Millennium Binghatti Residences Business BayRegistered status: Finished
Business Bay · 246 units, 1 building
- Started
- 25 Sep 2017
- Current planned completion
- 15 Jul 2021
- Completed
- 31 Mar 2021
17 unit and villa sales in the year to Sep 2026
- BINGHATTI STARSRegistered status: Finished
Nadd Hessa · 362 units, 1 building
- Started
- 10 Jun 2017
- Current planned completion
- 28 Jan 2020
- Completed
- 01 Oct 2019
36 unit and villa sales in the year to Sep 2026
- BINGHATTI VIEWSRegistered status: Finished
Nadd Hessa · 174 units, 1 building
- Started
- 20 Apr 2015
- Current planned completion
- 20 Apr 2017
- Completed
- 20 Apr 2017
16 unit and villa sales in the year to Sep 2026
- BINGHATTI APARTMENTSRegistered status: Finished
Nadd Hessa · 224 units, 1 building
- Started
- 01 Jun 2014
- Current planned completion
- 15 Sep 2015
- Completed
- 13 Dec 2015
21 unit and villa sales in the year to Sep 2026
A project without a page on this site is named by its DLD project number.
Source: DLD projects register, read 11 Nov 2026.