Developer

Binghatti Developers FZE

DLD developer number 1051Registered with DLD on 06 Jan 2015

On the DLD projects register

Projects
85
Live
42
Completed
43
Cancelled
0
Planned completion in the next 12 months
18
Started in 2026
16

Planned completion dates moved 2 times since we started checking in Oct 2026, across 2 of 85 projects.

These are the register's current dates. A planned date that moved before we started checking isn't recorded, so this page doesn't say whether a project finished on time.

Source: DLD developers and projects registers, read 11 Nov 2026.

Projects

Newest start first. Each bar runs from the start date to the register's current planned completion date.

  1. DLD project 4471
    Registered status: Pending
    0% complete

    Al Rowaiyah First · 1,432 villas, 523 land plots

    Started
    15 Nov 2026
    Current planned completion
    31 Dec 2029
  2. Binghatti Spectre
    Registered status: Not started
    0% complete

    Al Jadaf · 966 units, 2 buildings

    Started
    01 Sep 2026
    Current planned completion
    31 Dec 2028
  3. Vision Iconic
    Registered status: Not started
    0% complete

    Nad Al Shiba First · 1,453 units, 1 building

    Started
    01 Aug 2026
    Current planned completion
    15 Dec 2028

    4 unit and villa sales in the year to Sep 2026

  4. Binghatti Wraith
    Registered status: Not started
    0% complete

    Al Jadaf · 881 units, 1 building

    Started
    01 Jul 2026
    Current planned completion
    30 Dec 2027

    45 unit and villa sales in the year to Sep 2026

  5. Binghatti Starfall
    Registered status: Not started
    0% complete

    Al Jadaf · 771 units, 1 building

    Started
    01 Jul 2026
    Current planned completion
    30 Sep 2028

    Planned date moved once since we started checking in Oct 2026

  6. DLD project 4405
    Registered status: Pending
    0% complete

    Wadi Al Safa 3 · 160 units, 1 building

    Started
    01 Mar 2026
    Current planned completion
    30 Jun 2027
  7. DLD project 4408
    Registered status: Pending
    0% complete

    Wadi Al Safa 3 · 350 units, 4 buildings

    Started
    01 Mar 2026
    Current planned completion
    30 Jun 2027
  8. DLD project 4409
    Registered status: Pending
    0% complete

    Wadi Al Safa 3 · 517 units, 2 buildings

    Started
    01 Mar 2026
    Current planned completion
    30 Jun 2027
  9. Binghatti Skyflame 1
    Registered status: Not started
    0% complete

    Wadi Al Safa 3 · 1,407 units, 1 building

    Started
    01 Feb 2026
    Current planned completion
    31 Dec 2027

    763 unit and villa sales in the year to Sep 2026

  10. Binghatti Skyflame 2
    Registered status: Not started
    0% complete

    Wadi Al Safa 3 · 801 units, 1 building

    Started
    01 Feb 2026
    Current planned completion
    31 Dec 2027

    410 unit and villa sales in the year to Sep 2026

  11. Project Maybach
    Registered status: Not started
    0% complete

    Nad Al Shiba First · 831 units, 1 building

    Started
    14 Jan 2026
    Current planned completion
    30 Jun 2027

    205 unit and villa sales in the year to Sep 2026

  12. Maybach Ultimate Luxury
    Registered status: Not started
    0% complete

    Nad Al Shiba First · 1,233 units, 2 buildings

    Started
    14 Jan 2026
    Current planned completion
    31 Aug 2027

    236 unit and villa sales in the year to Sep 2026

73 more projects
  1. Maybach Six
    Registered status: Not started
    0% complete

    Nad Al Shiba First · 1,878 units, 2 buildings

    Started
    14 Jan 2026
    Current planned completion
    31 Aug 2027

    1,039 unit and villa sales in the year to Sep 2026

  2. Binghatti Luxuria
    Registered status: Active
    7% complete

    Al Barsha South Fifth · 469 units, 1 building

    Started
    01 Jan 2026
    Current planned completion
    30 Jul 2027

    171 unit and villa sales in the year to Sep 2026

  3. Binghatti Etherea
    Registered status: Active
    7.2% complete

    Al Barsha South Fourth · 287 units, 1 building

    Started
    01 Jan 2026
    Current planned completion
    31 Dec 2027

    61 unit and villa sales in the year to Sep 2026

  4. Binghatti Skyterraces
    Registered status: Not started
    0% complete

    Al Hebiah First · 1,886 units, 1 building

    Started
    01 Jan 2026
    Current planned completion
    31 Oct 2027

    623 unit and villa sales in the year to Sep 2026

  5. Binghatti Cullinan
    Registered status: Not started
    0% complete

    Al Jadaf · 652 units, 1 building

    Started
    01 Dec 2025
    Current planned completion
    30 Jun 2027

    503 unit and villa sales in the year to Sep 2026

  6. Binghatti Vintage
    Registered status: Not started
    0% complete

    Wadi Al Safa 3 · 1,572 units, 1 building

    Started
    01 Oct 2025
    Current planned completion
    31 Mar 2027

    1,511 unit and villa sales in the year to Sep 2026

  7. Binghatti Titania
    Registered status: Not started
    0% complete

    Wadi Al Safa 3 · 789 units, 1 building

    Started
    01 Oct 2025
    Current planned completion
    28 Feb 2027

    720 unit and villa sales in the year to Sep 2026

  8. Binghatti Hillcrest
    Registered status: Active
    60% complete

    Al Barshaa South Third · 396 units, 1 building

    Started
    01 Oct 2025
    Current planned completion
    31 Dec 2026

    Planned date moved once since we started checking in Oct 2026

    233 unit and villa sales in the year to Sep 2026

  9. Binghatti Flare 01
    Registered status: Active
    20% complete

    Al Barsha South Fifth · 845 units, 1 building

    Started
    15 Jul 2025
    Current planned completion
    14 Jul 2027

    663 unit and villa sales in the year to Sep 2026

  10. Binghatti Flare 02
    Registered status: Active
    17.8% complete

    Al Barsha South Fifth · 613 units, 1 building

    Started
    15 Jul 2025
    Current planned completion
    15 Jun 2027

    566 unit and villa sales in the year to Sep 2026

  11. Binghatti Circle
    Registered status: Active
    22.1% complete

    Al Barsha South Fourth · 822 units, 1 building

    Started
    01 Jun 2025
    Current planned completion
    31 May 2027

    350 unit and villa sales in the year to Sep 2026

  12. DLD project 4043
    Registered status: Pending
    4.3% complete

    Palm Jumeirah · 77 units, 1 building

    Started
    01 Jun 2025
    Current planned completion
    30 Apr 2027
  13. Binghatti Moonlight
    Registered status: Active
    19.2% complete

    Al Jadaf · 286 units, 1 building

    Started
    15 Apr 2025
    Current planned completion
    15 Jun 2026

    256 unit and villa sales in the year to Sep 2026

  14. Binghatti Twilight
    Registered status: Active
    55.4% complete

    Al Jadaf · 277 units, 1 building

    Started
    01 Apr 2025
    Current planned completion
    30 Apr 2026

    129 unit and villa sales in the year to Sep 2026

  15. Binghatti Aquarise
    Registered status: Active
    21% complete

    Business Bay · 1,592 units, 5 buildings

    Started
    15 Mar 2025
    Current planned completion
    31 Oct 2026

    597 unit and villa sales in the year to Sep 2026

  16. Binghatti Amberhall
    Registered status: Active
    70% complete

    Al Barsha South Fourth · 710 units, 1 building

    Started
    15 Feb 2025
    Current planned completion
    28 Feb 2026

    535 unit and villa sales in the year to Sep 2026

  17. Binghatti Skyhall
    Registered status: Active
    31.1% complete

    Business Bay · 728 units, 1 building

    Started
    01 Feb 2025
    Current planned completion
    31 Aug 2026

    231 unit and villa sales in the year to Sep 2026

  18. Binghatti Skyblade
    Registered status: Active
    17.1% complete

    Burj Khalifa · 596 units, 1 building

    Started
    01 Feb 2025
    Current planned completion
    30 Nov 2027

    566 unit and villa sales in the year to Sep 2026

  19. Binghatti Hillside
    Registered status: Active
    80% complete

    Al Barshaa South Second · 411 units, 1 building

    Started
    31 Jan 2025
    Current planned completion
    30 Jun 2026

    254 unit and villa sales in the year to Sep 2026

  20. Binghatti Ruby
    Registered status: Active
    65% complete

    Al Barsha South Fourth · 628 units, 1 building

    Started
    01 Jan 2025
    Current planned completion
    28 Feb 2026

    227 unit and villa sales in the year to Sep 2026

  21. Binghatti Haven
    Registered status: Active
    76.1% complete

    Al Hebiah Fourth · 501 units, 1 building

    Started
    17 Dec 2024
    Current planned completion
    31 Mar 2026

    217 unit and villa sales in the year to Sep 2026

  22. Binghatti Elite
    Registered status: Active
    53.3% complete

    Me'Aisem First · 1,745 units, 1 building

    Started
    30 Nov 2024
    Current planned completion
    30 Jun 2026

    182 unit and villa sales in the year to Sep 2026

  23. Binghatti Skyrise
    Registered status: Active
    35.9% complete

    Business Bay · 3,358 units, 4 buildings

    Started
    15 Oct 2024
    Current planned completion
    31 Dec 2026

    432 unit and villa sales in the year to Sep 2026

  24. Binghatti Ivory
    Registered status: Finished

    Al Jadaf · 332 units, 1 building

    Started
    01 Oct 2024
    Current planned completion
    31 Dec 2025
    Completed
    15 Sep 2026

    66 unit and villa sales in the year to Sep 2026

  25. Binghatti Grove
    Registered status: Finished

    Al Barsha South Fourth · 404 units, 1 building

    Started
    01 Oct 2024
    Current planned completion
    31 Mar 2026
    Completed
    01 Oct 2026

    71 unit and villa sales in the year to Sep 2026

  26. Binghatti Hillviews
    Registered status: Active
    32.6% complete

    Al Barshaa South Second · 1,575 units, 1 building

    Started
    01 Oct 2024
    Current planned completion
    01 Apr 2026

    487 unit and villa sales in the year to Sep 2026

  27. Binghatti Pinnacle
    Registered status: Finished

    Al Jadaf · 178 units, 1 building

    Started
    01 Sep 2024
    Current planned completion
    31 Dec 2025
    Completed
    30 Jul 2026

    152 unit and villa sales in the year to Sep 2026

  28. Binghatti Aurora
    Registered status: Finished

    Al Barsha South Fourth · 275 units, 1 building

    Started
    01 Aug 2024
    Current planned completion
    31 Dec 2025
    Completed
    15 Oct 2025

    73 unit and villa sales in the year to Sep 2026

  29. Binghatti Ghost
    Registered status: Finished

    Al Jadaf · 785 units, 1 building

    Started
    31 Jul 2024
    Current planned completion
    31 Mar 2026
    Completed
    23 Sep 2026

    153 unit and villa sales in the year to Sep 2026

  30. Binghatti Starlight
    Registered status: Active
    63.1% complete

    Al Jadaf · 511 units, 1 building

    Started
    30 Jul 2024
    Current planned completion
    31 Mar 2026

    206 unit and villa sales in the year to Sep 2026

  31. Binghatti Apex
    Registered status: Finished

    Al Barsha South Fourth · 552 units, 1 building

    Started
    01 May 2024
    Current planned completion
    30 Apr 2026
    Completed
    23 Apr 2026

    271 unit and villa sales in the year to Sep 2026

  32. Binghatti Hills
    Registered status: Active
    90% complete

    Al Barshaa South Second · 1,701 units, 2 buildings

    Started
    01 Apr 2024
    Current planned completion
    Not published

    352 unit and villa sales in the year to Sep 2026

  33. One by Binghatti
    Registered status: Active
    50.2% complete

    Business Bay · 755 units, 1 building

    Started
    01 Mar 2024
    Current planned completion
    30 May 2026

    209 unit and villa sales in the year to Sep 2026

  34. Binghatti Phantom
    Registered status: Finished

    Al Barsha South Fourth · 369 units, 1 building

    Started
    15 Feb 2024
    Current planned completion
    Not published
    Completed
    06 Oct 2025

    50 unit and villa sales in the year to Sep 2026

  35. Binghatti Phoenix
    Registered status: Finished

    Al Barsha South Fourth · 464 units, 1 building

    Started
    01 Feb 2024
    Current planned completion
    Not published
    Completed
    15 Oct 2025

    103 unit and villa sales in the year to Sep 2026

  36. Binghatti Royale
    Registered status: Finished

    Al Barsha South Fourth · 370 units, 1 building

    Started
    14 Jan 2024
    Current planned completion
    Not published
    Completed
    15 Oct 2025

    149 unit and villa sales in the year to Sep 2026

  37. Dawn by Binghatti
    Registered status: Finished

    Al Barsha South Fourth · 97 units, 1 building

    Started
    01 Jan 2024
    Current planned completion
    30 Dec 2024
    Completed
    19 May 2025

    5 unit and villa sales in the year to Sep 2026

  38. Dusk by Binghatti
    Registered status: Finished

    Al Barsha South Fourth · 107 units, 1 building

    Started
    01 Jan 2024
    Current planned completion
    31 Dec 2024
    Completed
    31 Dec 2024

    11 unit and villa sales in the year to Sep 2026

  39. Mercedes-Benz Places | Binghatti
    Registered status: Active
    65.3% complete

    Burj Khalifa · 163 units, 1 building

    Started
    15 Dec 2023
    Current planned completion
    31 Dec 2026

    33 unit and villa sales in the year to Sep 2026

  40. Binghatti Azure
    Registered status: Finished

    Al Barsha South Fourth · 650 units, 1 building

    Started
    15 Dec 2023
    Current planned completion
    31 Dec 2024
    Completed
    31 Dec 2024

    138 unit and villa sales in the year to Sep 2026

  41. Binghatti Lavender
    Registered status: Finished

    Al Barsha South Fourth · 166 units, 1 building

    Started
    15 Nov 2023
    Current planned completion
    29 Oct 2024
    Completed
    29 Oct 2024

    13 unit and villa sales in the year to Sep 2026

  42. Binghatti Tulip
    Registered status: Finished

    Al Barsha South Fourth · 279 units, 1 building

    Started
    25 Oct 2023
    Current planned completion
    Not published
    Completed
    24 Mar 2025

    41 unit and villa sales in the year to Sep 2026

  43. Binghatti Galaxy
    Registered status: Finished

    Al Barsha South Fourth · 147 units, 2 buildings

    Started
    30 Sep 2023
    Current planned completion
    Not published
    Completed
    10 Mar 2025

    13 unit and villa sales in the year to Sep 2026

  44. Binghatti Orchid
    Registered status: Finished

    Al Barsha South Fourth · 314 units, 1 building

    Started
    01 Aug 2023
    Current planned completion
    Not published
    Completed
    20 Dec 2024

    39 unit and villa sales in the year to Sep 2026

  45. Binghatti Venus
    Registered status: Finished

    Al Barsha South Fourth · 191 units, 1 building

    Started
    01 Jun 2023
    Current planned completion
    31 Aug 2024
    Completed
    31 Aug 2024

    16 unit and villa sales in the year to Sep 2026

  46. Binghatti Amber
    Registered status: Finished

    Al Barsha South Fourth · 658 units, 1 building

    Started
    01 Jun 2023
    Current planned completion
    30 Oct 2024
    Completed
    30 Oct 2024

    66 unit and villa sales in the year to Sep 2026

  47. Binghatti Gardenia
    Registered status: Finished

    Al Barsha South Fourth · 308 units, 1 building

    Started
    25 May 2023
    Current planned completion
    25 Jul 2024
    Completed
    25 Jul 2024

    37 unit and villa sales in the year to Sep 2026

  48. Binghatti House
    Registered status: Finished

    Al Barsha South Fourth · 294 units, 1 building

    Started
    15 May 2023
    Current planned completion
    25 Jul 2024
    Completed
    25 Jul 2024

    39 unit and villa sales in the year to Sep 2026

  49. Binghatti Onyx
    Registered status: Finished

    Al Barsha South Fourth · 507 units, 1 building

    Started
    23 Mar 2023
    Current planned completion
    01 Oct 2024
    Completed
    01 Oct 2024

    71 unit and villa sales in the year to Sep 2026

  50. Bugatti Residences by Binghatti
    Registered status: Active
    65.6% complete

    Business Bay · 187 units, 1 building

    Started
    01 Mar 2023
    Current planned completion
    31 Dec 2025

    33 unit and villa sales in the year to Sep 2026

  51. Trillionaire Residences by Binghatti
    Registered status: Finished

    Business Bay · 369 units, 1 building

    Started
    01 Jan 2023
    Current planned completion
    30 Jun 2024
    Completed
    30 Jun 2024

    37 unit and villa sales in the year to Sep 2026

  52. Binghatti Emerald
    Registered status: Finished

    Al Barsha South Fourth · 328 units, 1 building

    Started
    15 Dec 2022
    Current planned completion
    28 Feb 2024
    Completed
    28 Feb 2024

    27 unit and villa sales in the year to Sep 2026

  53. Binghatti Crescent
    Registered status: Finished

    Al Barsha South Fourth · 170 units, 1 building

    Started
    15 Oct 2022
    Current planned completion
    26 Oct 2023
    Completed
    26 Oct 2023

    17 unit and villa sales in the year to Sep 2026

  54. Binghatti Corner
    Registered status: Finished

    Al Barsha South Fourth · 727 units, 1 building

    Started
    01 Oct 2022
    Current planned completion
    31 Mar 2024
    Completed
    31 Mar 2024

    62 unit and villa sales in the year to Sep 2026

  55. DLD project 2480
    Registered status: Active
    52.1% complete

    Business Bay · 325 units, 1 building

    Started
    01 Oct 2022
    Current planned completion
    30 Jun 2026
  56. Binghatti Crest
    Registered status: Finished

    Al Barsha South Fourth · 171 units, 1 building

    Started
    15 Sep 2022
    Current planned completion
    31 Oct 2023
    Completed
    31 Oct 2023

    19 unit and villa sales in the year to Sep 2026

  57. Binghatti Nova
    Registered status: Finished

    Al Barsha South Fourth · 211 units, 1 building

    Started
    15 Sep 2022
    Current planned completion
    31 Oct 2023
    Completed
    31 Oct 2023

    11 unit and villa sales in the year to Sep 2026

  58. Binghatti Luna
    Registered status: Finished

    Al Barsha South Fourth · 212 units, 1 building

    Started
    01 Sep 2022
    Current planned completion
    31 Oct 2023
    Completed
    31 Oct 2023

    10 unit and villa sales in the year to Sep 2026

  59. Binghatti Heights
    Registered status: Finished

    Al Barsha South Fourth · 366 units, 1 building

    Started
    13 Jun 2022
    Current planned completion
    15 Aug 2023
    Completed
    15 Aug 2023

    31 unit and villa sales in the year to Sep 2026

  60. Binghatti Creek
    Registered status: Finished

    Al Jadaf · 335 units, 1 building

    Started
    07 Feb 2022
    Current planned completion
    30 Apr 2023
    Completed
    30 Apr 2023

    20 unit and villa sales in the year to Sep 2026

  61. Binghatti Canal
    Registered status: Finished

    Business Bay · 306 units, 1 building

    Started
    28 Jan 2022
    Current planned completion
    30 Jun 2023
    Completed
    30 Jun 2023

    31 unit and villa sales in the year to Sep 2026

  62. Binghatti Jasmine
    Registered status: Finished

    Al Barsha South Fourth · 92 units, 1 building

    Started
    01 Jan 2022
    Current planned completion
    31 Jan 2023
    Completed
    31 Jan 2023

    8 unit and villa sales in the year to Sep 2026

  63. Binghatti Gems
    Registered status: Finished

    Al Barsha South Fourth · 77 units, 1 building

    Started
    08 Apr 2021
    Current planned completion
    30 Jun 2022
    Completed
    30 Jun 2022

    4 unit and villa sales in the year to Sep 2026

  64. Binghatti Rose
    Registered status: Finished

    Al Barsha South Fourth · 171 units, 1 building

    Started
    01 Apr 2021
    Current planned completion
    30 Apr 2022
    Completed
    30 Apr 2022

    6 unit and villa sales in the year to Sep 2026

  65. Binghatti Mirage
    Registered status: Finished

    Al Barsha South Fourth · 160 units, 1 building

    Started
    10 Jan 2021
    Current planned completion
    19 Jun 2022
    Completed
    19 Jun 2022

    10 unit and villa sales in the year to Sep 2026

  66. Binghatti Gate
    Registered status: Finished

    Al Barsha South Fourth · 132 units, 1 building

    Started
    01 Nov 2020
    Current planned completion
    17 Jan 2022
    Completed
    17 Jan 2022

    12 unit and villa sales in the year to Sep 2026

  67. Binghatti Avenue
    Registered status: Finished

    Al Jadaf · 639 units, 1 building

    Started
    01 Oct 2019
    Current planned completion
    26 Apr 2022
    Completed
    26 Apr 2022

    52 unit and villa sales in the year to Sep 2026

  68. Binghatti Point
    Registered status: Finished

    Nadd Hessa · 127 units, 1 building

    Started
    01 Mar 2019
    Current planned completion
    03 Feb 2022
    Completed
    03 Feb 2022

    8 unit and villa sales in the year to Sep 2026

  69. Binghatti Gateway
    Registered status: Finished

    Al Jadaf · 182 units, 1 building

    Started
    15 Jan 2019
    Current planned completion
    30 Jun 2021
    Completed
    30 Jun 2021

    10 unit and villa sales in the year to Sep 2026

  70. Business Bay · 246 units, 1 building

    Started
    25 Sep 2017
    Current planned completion
    15 Jul 2021
    Completed
    31 Mar 2021

    17 unit and villa sales in the year to Sep 2026

  71. BINGHATTI STARS
    Registered status: Finished

    Nadd Hessa · 362 units, 1 building

    Started
    10 Jun 2017
    Current planned completion
    28 Jan 2020
    Completed
    01 Oct 2019

    36 unit and villa sales in the year to Sep 2026

  72. BINGHATTI VIEWS
    Registered status: Finished

    Nadd Hessa · 174 units, 1 building

    Started
    20 Apr 2015
    Current planned completion
    20 Apr 2017
    Completed
    20 Apr 2017

    16 unit and villa sales in the year to Sep 2026

  73. BINGHATTI APARTMENTS
    Registered status: Finished

    Nadd Hessa · 224 units, 1 building

    Started
    01 Jun 2014
    Current planned completion
    15 Sep 2015
    Completed
    13 Dec 2015

    21 unit and villa sales in the year to Sep 2026

A project without a page on this site is named by its DLD project number.

Source: DLD projects register, read 11 Nov 2026.